Allied Furnace: Platform installation of a horizontal unit
Platform installation of a horizontal unit on a Allied furnace: Used for horizontal units set on a raised platform or suspended in an attic or crawl space.
Applies to: Horizontal installs in attic or crawl space
How to fix platform installation of a horizontal unit: step by step
- Select a location that keeps service and required clearances.
- Build a raised wooden frame and cover it with plywood. Use an auxiliary drain pan under the unit if installed over finished space.
- Leave 8 in of service clearance below the unit for the condensate trap.
- Provide a service platform in front of the unit. In a crawl space, cement blocks can serve as support.
- Route the auxiliary drain so water is easy to notice.
- If needed, use a condensate pump rated for condensing furnaces. Protect the discharge line to the outside from freezing.
- Install exhaust, condensate and intake piping per the instructions.
If the unit shows an error code, look it up: Allied Furnace codes
Source: Allied 92G1UH installation instructions manual, p. 16. Written in our own words as a summary; always check the original manual.
General guidance for qualified technicians. The manufacturer's installation and service manual and local codes always take priority. Aurora Star Tech is not affiliated with, endorsed by or sponsored by any equipment manufacturer; brand and model names are used only to identify equipment and belong to their owners.