Weil-McLain Boiler: Vent and air termination location clearances
Vent and air termination location clearances on a Weil-McLain boiler: Applies to direct vent and direct exhaust terminations. Vent and air terminations must sit at least 12 in above grade and above the snow line. Keep them clear of snow buildup. Keep the termination at least 4 ft horizontally from electrical meters, gas meters, regulators and relief equipment, and never directly above or below them unless the 4 ft horizontal distance is kept. Also meet the clearances to walkways, buildings, openable windows and building openings set by NFGC/ANSI Z223.1 or CSA B149.1. Check the full clearance figure (Figure 26 for direct exhaust, Figure 33 for direct vent) before finalising placement.
Applies to: SlimFit 1000-2000 Series 2 direct exhaust and direct vent terminations
How to fix vent and air termination location clearances: step by step
- Confirm the termination is at least 12 in above grade and the snow line.
- Confirm at least 4 ft horizontal clearance from gas meters, electrical meters, regulators and relief equipment.
- Confirm clearance from openable windows, building openings and walkways per the figure and local code.
- Place the termination where foreign objects and leaves or sediment will not build up on it.
- For Canadian installs, use a ULC S636 compliant vent kit and follow CSA B149.1.
If the unit shows an error code, look it up: Weil-McLain Boiler codes
Source: SlimFit-1000-2000 Boiler Manual 550-100-561/1225, p. 32-33, 38-39. Written in our own words as a summary; always check the original manual.
General guidance for qualified technicians. The manufacturer's installation and service manual and local codes always take priority. Aurora Star Tech is not affiliated with, endorsed by or sponsored by any equipment manufacturer; brand and model names are used only to identify equipment and belong to their owners.