Weil-McLain Boiler: Vent and air piping installation (general run rules)
Vent and air piping installation (general run rules) on a Weil-McLain boiler: General rules for running vent and air pipe from the boiler to the termination.
Applies to: SVF direct vent piping, all termination types
How to fix vent and air piping installation (general run rules): step by step
- Use only the vent materials and kits listed in the venting materials table (Table 9, page 33).
- Use a locking collar on every joint of polypropylene vent piping; missing collars can leak.
- Use sweep elbows only. Do not use short-radius elbows in vent or air piping.
- Install a vent adapter or reducer where needed, following the vent maker's instructions.
- Slope vent piping back toward the boiler at least 1/4 in per foot on horizontal runs, or more if the vent maker requires.
- Support the piping independently of the boiler, with supports at least every 5 ft on horizontal and vertical runs, and a hanger within 6 in of any upturn.
- Brace individual external vent and air pipes no more than 24 in apart. Keep the total length of each external pipe to 4 ft or less unless it is enclosed.
- If an external vent or air pipe is longer than 4 ft, put it in an insulated enclosure to reduce condensate freezing inside the pipe, and pass the terminations through that enclosure while keeping required clearances.
- Seal exterior openings thoroughly with exterior caulk.
If the unit shows an error code, look it up: Weil-McLain Boiler codes
Source: SVF 500/600 Series 1 Boiler Manual, p. 51. Written in our own words as a summary; always check the original manual.
General guidance for qualified technicians. The manufacturer's installation and service manual and local codes always take priority. Aurora Star Tech is not affiliated with, endorsed by or sponsored by any equipment manufacturer; brand and model names are used only to identify equipment and belong to their owners.