Setting up the boiler (commissioning order) on a Weil-McLain boiler: Four-step order for control setup from the manual.

Homeowner with a boiler problem? Call (647) 657-2977 or book a service call — licensed technicians across Vaughan and the GTA.

Applies to: SVF control commissioning

How to fix setting up the boiler (commissioning order): step by step

  1. Step 1: Determine input and output needs (thermostats, remote contacts, end switches and what each output must run, such as a pump or air louver).
  2. Step 2: Install the boiler per the boiler manual, then wire control inputs and outputs for the Step 1 purposes.
  3. Step 3: Follow the boiler manual to start up and power the boiler.
  4. Step 4: Use the Wizard (recommended) or enter control parameters manually.
Safety: Gas, electrical and refrigerant work must be done by a licensed technician. Turn off power and gas before servicing, never bypass a safety control, and always follow the manufacturer's manual for your exact model.

If the unit shows an error code, look it up: Weil-McLain Boiler codes

Source: SVF 500/600 Series 1 boiler manual, p. 85. Written in our own words as a summary; always check the original manual.

General guidance for qualified technicians. The manufacturer's installation and service manual and local codes always take priority. Aurora Star Tech is not affiliated with, endorsed by or sponsored by any equipment manufacturer; brand and model names are used only to identify equipment and belong to their owners.