Warming things up…Dialing in your comfort…Almost cozy…
Reliable Heating and Cooling Solutions – Quality Service, Fair Prices, Guaranteed Satisfaction!

Weil-McLain Boiler: Seal the flue collector hood and rear base panels

Updated · by Aurora Star Tech Inc.

Seal the flue collector hood and rear base panels on a Weil-McLain boiler: Gas-tight seal at the flue collector hood and rear base is required. A leak lets flue gas and carbon monoxide spill into the room.

Homeowner with a boiler problem? Call (647) 657-2977 or book a service call — licensed technicians across Vaughan and the GTA.

Applies to: EG/PEG Series 7, all sizes

How to fix seal the flue collector hood and rear base panels: step by step

  1. Set the flue collector hood on the boiler as shown in Figure 6 (factory installed on PEG).
  2. Use the boiler cement supplied to make a gas-tight seal at the hood.
  3. For EG-30 through EG-75, fasten the rear base panels (2 pieces, 7 5/16 in. high) to the section assembly channel.
  4. Seal along the top of the insulation panels with boiler cement.
Safety: Gas, electrical and refrigerant work must be done by a licensed technician. Turn off power and gas before servicing, never bypass a safety control, and always follow the manufacturer's manual for your exact model.

If the unit shows an error code, look it up: Weil-McLain Boiler codes

Source: EG/PEG Series 7 boiler manual, p. 16. Written in our own words as a summary; always check the original manual.

General guidance for qualified technicians. The manufacturer's installation and service manual and local codes always take priority. Aurora Star Tech is not affiliated with, endorsed by or sponsored by any equipment manufacturer; brand and model names are used only to identify equipment and belong to their owners.

Emergency Boiler Repair

647-657-2977