Weil-McLain Boiler: Roof penetration and vent support for vertical direct exhaust
Roof penetration and vent support for vertical direct exhaust on a Weil-McLain boiler: Size the roof hole at least 0.5 in larger than the vent pipe. For 6 in PVC or PP, use a 7 in hole. Insert a galvanized thimble and use flashing and boots sized for the vent and air pipes. Hanger supports go within 6 in of any upturn, pipe supports every 5 ft on horizontal and vertical runs, and horizontal pipe slopes down toward the boiler at least 1/4 in per foot.
Applies to: Vertical direct exhaust installations
How to fix roof penetration and vent support for vertical direct exhaust: step by step
- Cut a roof hole at least 0.5 in larger than the vent pipe (7 in for 6 in PVC or PP).
- Insert a galvanized metal thimble.
- Install flashing and sealing boots sized for the vent and air pipe.
- Place a hanger support within 6 in of any upturn.
- Support runs every 5 ft on horizontal and vertical sections.
- Slope horizontal pipe toward the boiler at least 1/4 in per foot.
If the unit shows an error code, look it up: Weil-McLain Boiler codes
Source: SlimFit series 3 commercial gas-fired water boiler manual, p. 27. Written in our own words as a summary; always check the original manual.
General guidance for qualified technicians. The manufacturer's installation and service manual and local codes always take priority. Aurora Star Tech is not affiliated with, endorsed by or sponsored by any equipment manufacturer; brand and model names are used only to identify equipment and belong to their owners.