Weil-McLain Boiler: Pre-start checklist before powering the boiler
Pre-start checklist before powering the boiler on a Weil-McLain boiler: Final checks to complete before applying power.
Applies to: ECO Tec Series 3 80/110/150/199
How to fix pre-start checklist before powering the boiler: step by step
- Read the instructions to set up the control.
- Verify the boiler model is set correctly in the control and displays correctly.
- Verify the boiler and system are full of water and components are set for operation.
- Verify the condensate trap is full of water.
- Verify electrical connections are correct, secure and sealed at cabinet openings.
- Inspect vent and air piping for corrosion, damage or sagging and confirm they are intact and installed per the manual.
- Check water piping and DHW piping (combi models) for leaks and vent remaining air from manual vents.
- Check all vent and air piping connections for a gas-tight seal.
If the unit shows an error code, look it up: Weil-McLain Boiler codes
Source: ECO Tec Series 3 Condensing Gas Boiler Boiler Manual, p. 133. Written in our own words as a summary; always check the original manual.
General guidance for qualified technicians. The manufacturer's installation and service manual and local codes always take priority. Aurora Star Tech is not affiliated with, endorsed by or sponsored by any equipment manufacturer; brand and model names are used only to identify equipment and belong to their owners.