Weil-McLain Boiler: Multiple boiler gas header and manual shutoff
Multiple boiler gas header and manual shutoff on a Weil-McLain boiler: Gas header requirements when several boilers share a supply line.
Applies to: Ultra manifolded gas supply
How to fix multiple boiler gas header and manual shutoff: step by step
- Build the gas header from the manifold sizing tables and the National Fuel Gas Code.
- Install a manual shutoff gas valve and ground joint union for each boiler.
- Use a 3/4-inch NPT riser from the header to the boiler for most jobs.
- Confirm that the minimum pressure at the boiler is at least 5 inches water column with all connected appliances firing.
- If the gas line enters the top of the boiler, the internal gas piping forms the drip leg.
If the unit shows an error code, look it up: Weil-McLain Boiler codes
Source: Weil-McLain Ultra Series 4 boiler manual, p. 93. Written in our own words as a summary; always check the original manual.
General guidance for qualified technicians. The manufacturer's installation and service manual and local codes always take priority. Aurora Star Tech is not affiliated with, endorsed by or sponsored by any equipment manufacturer; brand and model names are used only to identify equipment and belong to their owners.