Weil-McLain Boiler: Massachusetts sidewall-vented installation requirements
Massachusetts sidewall-vented installation requirements on a Weil-McLain boiler: Required when a sidewall horizontally vented gas boiler is installed in a dwelling used for residential purposes and the vent termination is less than 7 ft above grade. Licensed plumber or gas fitter must install it.
Applies to: ECO Tec Series 3 sidewall vent in Massachusetts
How to fix massachusetts sidewall-vented installation requirements: step by step
- Confirm a hard-wired carbon monoxide detector with alarm and battery backup is installed on the floor level where the boiler is installed.
- Confirm a battery-operated or hard-wired CO detector with alarm is installed on each additional level served.
- If the boiler is in a crawl space or attic, the detector may go on the next adjacent floor level.
- If the detector requirements cannot be met at completion, a battery-operated CO detector with alarm must be installed and the owner has 30 days to complete the hard-wired installation.
- Use CO detectors that meet NFPA 720 and are ANSI/UL 2034 listed and IAS certified.
- Install a metal or plastic sign on the building exterior at least 8 ft above grade, in line with the vent terminal, with lettering at least 1/2 in. high reading "GAS VENT DIRECTLY BELOW - KEEP CLEAR OF ALL OBSTRUCTIONS".
- Leave a copy of all installation and venting instructions and parts lists with the appliance.
If the unit shows an error code, look it up: Weil-McLain Boiler codes
Source: ECO Tec series 3 boiler manual, p. 29. Written in our own words as a summary; always check the original manual.
General guidance for qualified technicians. The manufacturer's installation and service manual and local codes always take priority. Aurora Star Tech is not affiliated with, endorsed by or sponsored by any equipment manufacturer; brand and model names are used only to identify equipment and belong to their owners.