Weil-McLain Boiler: Maintenance schedule (daily, monthly, six-month, end of season)
Maintenance schedule (daily, monthly, six-month, end of season) on a Weil-McLain boiler: Owner and service items from Figure 118. Owner items are covered in the Ultra User's Information Manual.
Applies to: Ultra Series 4 boilers
How to fix maintenance schedule (daily, monthly, six-month, end of season): step by step
- Daily: check boiler area, check air openings, check pressure/temperature gauge, verify front door is securely in place.
- Monthly: check vent piping, air piping, relief valve, condensate drain system and automatic air vents if used.
- Periodically: test low water cutoff if used.
- Every 6 months: check boiler piping (gas and water). Operate the relief valve.
- End of season: shut the boiler down unless it supplies domestic water.
If the unit shows an error code, look it up: Weil-McLain Boiler codes
Source: Ultra Series 4 gas-fired water boiler manual, p. 108. Written in our own words as a summary; always check the original manual.
General guidance for qualified technicians. The manufacturer's installation and service manual and local codes always take priority. Aurora Star Tech is not affiliated with, endorsed by or sponsored by any equipment manufacturer; brand and model names are used only to identify equipment and belong to their owners.