Weil-McLain Boiler: Install sidewall concentric vent termination
Install sidewall concentric vent termination on a Weil-McLain boiler: The concentric kit is bought separately and must be assembled and mounted before the piping runs to the boiler.
Applies to: Sidewall concentric direct vent
How to fix install sidewall concentric vent termination: step by step
- Read the vent and air piping instructions and confirm the wall location meets termination clearances.
- Assemble the concentric termination and mount it before running piping from the boiler.
- Cut the wall opening. A thimble with a 4-1/2 in hole is preferred. If cutting without a thimble, do not exceed 4-3/4 in.
- Make sure the wall opening gives a solid stop for the rain cap ribs.
- Secure the termination so the rain cap butts against the outer wall or thimble plate.
- Support the termination so it cannot slip or move. Keep clamps off the pipe to prevent cracking.
- Run vent and air piping from the boiler to the termination. Do not let the piping weight rest on boiler fittings.
- Place a bird screen on the inner pipe end and cement the rain cap once the assembly is set.
If the unit shows an error code, look it up: Weil-McLain Boiler codes
Source: ECO Tec Series 3 boiler manual, p. 35-36. Written in our own words as a summary; always check the original manual.
General guidance for qualified technicians. The manufacturer's installation and service manual and local codes always take priority. Aurora Star Tech is not affiliated with, endorsed by or sponsored by any equipment manufacturer; brand and model names are used only to identify equipment and belong to their owners.