Warming things up…Dialing in your comfort…Almost cozy…
Reliable Heating and Cooling Solutions – Quality Service, Fair Prices, Guaranteed Satisfaction!

Weil-McLain Boiler: Install low water cut-off (LWCO)

Updated · by Aurora Star Tech Inc.

Install low water cut-off (LWCO) on a Weil-McLain boiler: LWCO is required and is installer supplied. Use the Weil-McLain LWCO kit where possible.

Homeowner with a boiler problem? Call (647) 657-2977 or book a service call — licensed technicians across Vaughan and the GTA.

Applies to: ECO Tec Series 3 all models

How to fix install low water cut-off (lwco): step by step

  1. Install the low water cut-off per Figure 55, page 47.
  2. If using the Weil-McLain LWCO kit, connect its harness to J21 as shown in the control wiring diagram.
  3. If using another LWCO, it must have an isolated contact. Clip the factory jumper and connect the device to J21 as shown in the wiring diagram.
  4. Route the LWCO harness from its mounting location to the control. Provide strain relief and a seal at the cabinet entry if mounted outside the cabinet.
Safety: Gas, electrical and refrigerant work must be done by a licensed technician. Turn off power and gas before servicing, never bypass a safety control, and always follow the manufacturer's manual for your exact model.

If the unit shows an error code, look it up: Weil-McLain Boiler codes

Source: ECO Tec series 3 condensing gas boiler boiler manual, p. 71. Written in our own words as a summary; always check the original manual.

General guidance for qualified technicians. The manufacturer's installation and service manual and local codes always take priority. Aurora Star Tech is not affiliated with, endorsed by or sponsored by any equipment manufacturer; brand and model names are used only to identify equipment and belong to their owners.

Emergency Boiler Repair

647-657-2977