Weil-McLain Boiler: Install direct vent vertical terminations
Install direct vent vertical terminations on a Weil-McLain boiler: Vertical vent and air terminations need flashing and sealing boots sized for the pipe. Terminations use a coupling or open-end pipe per vent maker guidelines. Maintain the finished termination dimensions in the manual's figure. Vertical vent with sidewall air uses stop plates at the wall and a down-turned air elbow.
Applies to: SlimFit boilers in vertical direct vent configuration
How to fix install direct vent vertical terminations: step by step
- Cut the air pipe hole sized per the vent/air maker's instructions.
- Cut the vent pipe hole and size it as for sidewall venting; insert a corrosion-resistant thimble.
- Install flashing and sealing boots sized for the vent pipe.
- Terminate vertically with a coupling or open-end pipe per vent maker guidance and add bird screens in open ends.
- Maintain the finished termination dimensions shown in the manual.
- For sidewall air with vertical vent, fit stop plates, insert the air pipe until the shoulder seats, install the down-turned air elbow and a bird screen, then seal with exterior caulk.
If the unit shows an error code, look it up: Weil-McLain Boiler codes
Source: Weil-McLain SlimFit Series 2 boiler manual, p. 41, p. 42, p. 43. Written in our own words as a summary; always check the original manual.
General guidance for qualified technicians. The manufacturer's installation and service manual and local codes always take priority. Aurora Star Tech is not affiliated with, endorsed by or sponsored by any equipment manufacturer; brand and model names are used only to identify equipment and belong to their owners.