Weil-McLain Boiler: Hydrostatic pressure test before piping
Hydrostatic pressure test before piping on a Weil-McLain boiler: Test the boiler water side before water, gas or electrical hookup. Test pressure limits depend on the relief valve rating.
Applies to: CGi-25 to CGi-8
How to fix hydrostatic pressure test before piping: step by step
- Remove the shipping nipple from the supply tapping and remove the relief valve. Plug the relief tapping with a 3/4 inch NPT plug.
- Install the drain valve and pressure/temperature gauge on the return and supply connections, plus the circulator hardware.
- Connect a hose from the boiler drain valve to a fresh water supply.
- Install shutoff valves with nipples on the system supply and return to bleed air during fill.
- Open the shutoff valves, then slowly open the drain valve and fill the boiler with water.
- When water flows from the shutoff valves, close the drain valve and then close the shutoff valves.
- Slowly raise pressure to the limit in the pressure table, and hold for no more than 10 minutes.
- Keep constant pressure during the test and check all joints for leaks. Repair any leak right away.
- Disconnect the fill hose, drain the boiler, remove test nipples and valves not used in the system, and reinstall the relief valve.
If the unit shows an error code, look it up: Weil-McLain Boiler codes
Source: CGi Series 5 Gas-Fired Water Boiler boiler manual, p. 17. Written in our own words as a summary; always check the original manual.
General guidance for qualified technicians. The manufacturer's installation and service manual and local codes always take priority. Aurora Star Tech is not affiliated with, endorsed by or sponsored by any equipment manufacturer; brand and model names are used only to identify equipment and belong to their owners.