Weil-McLain Boiler: Hydrostatic pressure test before connecting gas, water or power
Hydrostatic pressure test before connecting gas, water or power on a Weil-McLain boiler: Pressure test the boiler before permanent water or gas piping and electrical supply are connected. Do not exceed 120 psig.
Applies to: All SlimFit boilers
How to fix hydrostatic pressure test before connecting gas, water or power: step by step
- Pipe the 2 inch tee, bushing and 3/4 inch nipple to the supply connection. Plug the end of the supply tee.
- Attach a 3/4 inch shutoff valve to the nipple, then a 2 inch tee to the return.
- Add a bushing and 3/4 inch drain valve to the return tee, and plug its end.
- Connect a hose from the drain valve to fresh water. Use pipe dope sparingly.
- Open the supply and return shutoff valves, then slowly fill the boiler through the drain valve.
- When water reaches the top shutoff valve, let it run until all air is out of the heat exchanger. Close the drain valve, then the top shutoff valve.
- Raise pressure until the P/T gauge reads 120 psig, but no higher.
- Hold for 10 minutes and keep the boiler attended. Confirm pressure holds and check for leaks.
- Drain through the drain valve, remove the test fittings, and remove the 3/4 inch shutoff valve from the relief nipple.
- Do not use petroleum-based cleaners or sealants in the system. Repair any leak immediately.
If the unit shows an error code, look it up: Weil-McLain Boiler codes
Source: SlimFit 550/750 Series 3 boiler manual, p. 11. Written in our own words as a summary; always check the original manual.
General guidance for qualified technicians. The manufacturer's installation and service manual and local codes always take priority. Aurora Star Tech is not affiliated with, endorsed by or sponsored by any equipment manufacturer; brand and model names are used only to identify equipment and belong to their owners.