Weil-McLain Boiler: Gas supply piping connection to the boiler
Gas supply piping connection to the boiler on a Weil-McLain boiler: Connect the gas line at the boiler without twisting the factory gas connection.
Applies to: SVF 500/600 gas supply piping
How to fix gas supply piping connection to the boiler: step by step
- Use two wrenches: one holds the boiler gas connection still while the other tightens the joint.
- Install a union for servicing where required.
- Install a manual gas shut-off valve in the supply line within 6 ft of the boiler. In Canada, the installer must identify this valve.
- Support the gas piping with hangers. Do not support it from the boiler or its accessories.
- Use pipe dope compatible with propane, since natural gas may contain some propane. Apply sparingly to male threads only so it does not block gas flow.
- The boiler ships ready for natural gas only. Install the propane conversion kit before connecting propane (see p. 16).
- If any factory gas connection is altered, check for leaks before operating the boiler (p. 63).
If the unit shows an error code, look it up: Weil-McLain Boiler codes
Source: Weil-McLain SVF 500/600 Series 1 boiler manual, p. 62. Written in our own words as a summary; always check the original manual.
General guidance for qualified technicians. The manufacturer's installation and service manual and local codes always take priority. Aurora Star Tech is not affiliated with, endorsed by or sponsored by any equipment manufacturer; brand and model names are used only to identify equipment and belong to their owners.