Example F - purpose and piping for variable-primary multi-boiler system on a Weil-McLain boiler: Space heating with multiple zones, using primary piping and a variable speed system circulator. Each boiler has its own isolation valve (Item 17a) and bypass or differential pressure bypass valve (Item 17b or 38). The flow switch (Item 34) is recommended if flow could drop below the minimum in the sizing table. The motorized valve end switch should be wired into the proof-of-closure circuit. Figure 17 shows four boilers, and the layout can be adjusted for three to eight boilers.
Applies to: Example F variable-primary piping, multiple EVG boilers
How to fix example f - purpose and piping for variable-primary multi-boiler system: step by step
- Pipe each boiler with an isolation valve, strainer on the return line, and boiler relief valve and discharge piping.
- Install a 2-way motorized valve with an end switch on each boiler (Item 17a) and wire the switch to proof of closure.
- Install a bypass valve or differential pressure bypass valve (Item 38) to prevent dead-heading the system pump.
- Install a flow switch (Item 34) if flow could drop below the minimum.
- Install system supply and return sensors (Item 30) within 6 pipe diameters, and no more than 3 feet, from the first and last boiler tees.
If the unit shows an error code, look it up: Weil-McLain Boiler codes
Source: Evergreen Series 2 advanced manual, p. 39. Written in our own words as a summary; always check the original manual.
General guidance for qualified technicians. The manufacturer's installation and service manual and local codes always take priority. Aurora Star Tech is not affiliated with, endorsed by or sponsored by any equipment manufacturer; brand and model names are used only to identify equipment and belong to their owners.