Weil-McLain Boiler: Direct vent vertical terminations (vent and air)
Direct vent vertical terminations (vent and air) on a Weil-McLain boiler: Vertical direct vent installs use separate vent and air terminations, which can be roof or sidewall for the air side.
Applies to: Direct vent vertical termination, Category IV
How to fix direct vent vertical terminations (vent and air): step by step
- Terminate all vent pipes at the same height and all air pipes at the same height.
- Cut separate penetrations for the air pipe and the vent pipe, and thimble the vent hole.
- For a vertical air termination, fit flashing and sealing boots and install a bird screen in the open end.
- Keep 12 in minimum vertically from the vent outlet to any air inlet.
- Keep 12 in minimum between the edge of one boiler's air intake and the adjacent vent of another boiler.
- For multiple boilers, space flue vents at least 6 in apart from other flue vents, and air terminations at least 6 in apart from other air terminations. Keep 12 in horizontal between flue vents and air terminations.
If the unit shows an error code, look it up: Weil-McLain Boiler codes
Source: SVF 500/600 Series 1 Boiler Manual, p. 46. Written in our own words as a summary; always check the original manual.
General guidance for qualified technicians. The manufacturer's installation and service manual and local codes always take priority. Aurora Star Tech is not affiliated with, endorsed by or sponsored by any equipment manufacturer; brand and model names are used only to identify equipment and belong to their owners.