Weil-McLain Boiler: Direct vent termination clearances (vent and air through roof)
Direct vent termination clearances (vent and air through roof) on a Weil-McLain boiler: Vent and air terminations through the roof must meet fixed heights and spacings. Air pipe ends in a down-turned 180-degree return bend with its edge at least 12 in above roof or snow line. Vent pipe ends in an up-turned coupling whose top is at least 12 in above the air intake to keep flue products out of the combustion air. Adjacent vent pipes of other boilers need 12 in minimum clearance on US installs. Canadian installs follow CSA B149 and a ULC S636 kit.
Applies to: 80/110/150/199 Series 3 direct vent
How to fix direct vent termination clearances (vent and air through roof): step by step
- Set the air return bend edge at least 12 in above roof or snow line.
- Set the vent up-turned coupling top at least 12 in above the air intake.
- Keep at least 12 in vertically from vent outlet to any air inlet.
- Keep at least 12 in between adjacent vent pipes of other boilers (US).
- Keep all vent outlets for multiple boilers at the same height.
- Maintain the finished termination dimensions shown in the manual figure.
If the unit shows an error code, look it up: Weil-McLain Boiler codes
Source: ECO Tec Series 3 Boiler Manual, p. 40. Written in our own words as a summary; always check the original manual.
General guidance for qualified technicians. The manufacturer's installation and service manual and local codes always take priority. Aurora Star Tech is not affiliated with, endorsed by or sponsored by any equipment manufacturer; brand and model names are used only to identify equipment and belong to their owners.