Direct exhaust sidewall termination steps on a Weil-McLain boiler: Use a coupling that butts against the outside wall plate. Choose the left-side configuration unless it fails minimum clearance to grade or snow line, then use the raised right-side (snorkel) configuration. Do not terminate next to the wall, under eaves, parapets, balconies or decks.
Applies to: Sidewall direct exhaust
How to fix direct exhaust sidewall termination steps: step by step
- Set the termination coupling against the outside wall plate.
- If clearance to grade or snow line fails, use the raised snorkel configuration with an elbow.
- Prepare wall penetrations before installing vent piping.
- Attach external pipe and fittings per termination instructions.
- Support vertical runs on the outside with brackets.
- Install vent piping from boiler to termination, with hanger support within 6 in of any upturn.
- Connect vent piping at the boiler per manual instructions.
If the unit shows an error code, look it up: Weil-McLain Boiler codes
Source: SlimFit series 3 commercial gas-fired water boiler manual, p. 31, 32. Written in our own words as a summary; always check the original manual.
General guidance for qualified technicians. The manufacturer's installation and service manual and local codes always take priority. Aurora Star Tech is not affiliated with, endorsed by or sponsored by any equipment manufacturer; brand and model names are used only to identify equipment and belong to their owners.