Weil-McLain Boiler: Connect vent and air pipe at the boiler
Connect vent and air pipe at the boiler on a Weil-McLain boiler: Work from the boiler outward to the termination. Use the adapters and connection sizes given for the pipe material in use.
Applies to: ECO Tec Series 3 wall-mount boilers, all vent and air connections
How to fix connect vent and air pipe at the boiler: step by step
- Read the termination instructions and the vent pipe maker's instructions before starting.
- Use only the vent materials listed for the job. Air inlet connection is 3 in PVC only.
- Use 3 in PVC, CPVC, SS (Simpson-Duravent only) or PP (Simpson-Duravent and Centrotherm) at the vent connection. Use transitions for other materials or for 2 in pipe.
- Cut pipe to length. Dry-fit the full vent or air run before gluing any joint.
- Deburr and clean both ends. Chamfer the boiler end of the vent pipe so it does not damage the adapter gasket.
- Inspect the adapter for obstructions or debris.
- Loosen the adapter clamp screw, mark the pipe at the insertion depth for its material, and lightly grease the pipe end.
- Push the pipe in until the mark meets the adapter. Do not force it or bend the adapter.
- Tighten the clamp firmly but not too tight. The internal gasket makes the seal; the clamp only holds the pipe.
If the unit shows an error code, look it up: Weil-McLain Boiler codes
Source: ECO Tec Series 3 boiler manual, p. 32. Written in our own words as a summary; always check the original manual.
General guidance for qualified technicians. The manufacturer's installation and service manual and local codes always take priority. Aurora Star Tech is not affiliated with, endorsed by or sponsored by any equipment manufacturer; brand and model names are used only to identify equipment and belong to their owners.