Weil-McLain Boiler: Connect gas supply piping to the boiler
Connect gas supply piping to the boiler on a Weil-McLain boiler: Gas piping must be leak-checked before the boiler is placed in operation. Remove the jacket front panel and follow the gas supply piping layout in Figure 25.
Applies to: CGi-25 to CGi-8 gas-fired boilers, natural gas and propane
How to fix connect gas supply piping to the boiler: step by step
- Remove the jacket front panel.
- Install a drip leg at the inlet of the boiler gas connection. Extend it to the floor with pipe between cap and tee if the local utility requires it.
- Install a ground joint union for servicing where required.
- Install a manual shutoff valve in the supply piping outside the jacket where local code or the utility requires it.
- Support the piping with hangers, not by the boiler or its accessories.
- Purge all air from the gas supply piping.
- Check the boiler and its gas connection for leaks using a bubble test. Never use an open flame.
- For pressure tests below 13 in. w.c., close the manual main shutoff valve.
- For pressure tests above 13 in. w.c., disconnect the boiler and gas valve from the supply piping.
- Use pipe dope that is compatible with propane, applied sparingly to male threads only so it does not block gas flow.
If the unit shows an error code, look it up: Weil-McLain Boiler codes
Source: Weil-McLain CGi Series 5 boiler manual, p. 38. Written in our own words as a summary; always check the original manual.
General guidance for qualified technicians. The manufacturer's installation and service manual and local codes always take priority. Aurora Star Tech is not affiliated with, endorsed by or sponsored by any equipment manufacturer; brand and model names are used only to identify equipment and belong to their owners.