Weil-McLain Boiler: Condensate line requirements

Updated · by Aurora Star Tech Inc.

Condensate line requirements on a Weil-McLain boiler: Keep condensate flowing freely or the boiler can lock out.

Homeowner with a boiler problem? Call (647) 657-2977 or book a service call — licensed technicians across Vaughan and the GTA.

Applies to: SVF 1500-3000

How to fix condensate line requirements: step by step

  1. Use 3/4 in PVC or CPVC pipe to a drain or condensate pump.
  2. Use materials that meet ASTM D1785, F441 or D2665, and cement that meets ASTM D2564 or F493. In Canada use CSA or ULC certified pipe, fittings and cement.
  3. Keep the line clear so condensate cannot freeze or back up into the boiler.
  4. Expect acidic condensate (about pH 3.2 to 4.5); install a neutralizer where local code requires it.
  5. Keep the trap float in place to prevent flue gas leakage through the drain.
Safety: Gas, electrical and refrigerant work must be done by a licensed technician. Turn off power and gas before servicing, never bypass a safety control, and always follow the manufacturer's manual for your exact model.

If the unit shows an error code, look it up: Weil-McLain Boiler codes

More other tips for boiler

Source: SVF Series 1 boiler manual, p. 46. Written in our own words as a summary; always check the original manual.

General guidance for qualified technicians. The manufacturer's installation and service manual and local codes always take priority. Aurora Star Tech is not affiliated with, endorsed by or sponsored by any equipment manufacturer; brand and model names are used only to identify equipment and belong to their owners.