Weil-McLain Boiler: Concentric termination assembly
Concentric termination assembly on a Weil-McLain boiler: Assembling the inner and outer pipe termination kit before installation.
Applies to: SVF concentric termination kit (vertical and sidewall)
How to fix concentric termination assembly: step by step
- Keep the rain cap and bird screen off until the assembly is through the roof or wall and all supports are in place.
- Cover the end of the assembly with plastic before inserting it through the penetration.
- Cut the bird screen to fit the outside diameter of the inner PVC pipe if trimming is needed.
- Partially assemble the termination in the order shown in the kit drawing or the kit instructions.
- Shorten the inner and outer pipes only if needed, and make sure they still connect correctly at both ends.
- Do not alter the concentric assembly. If it must be removed and cleaned, replace it instead.
- Make sure the concentric termination is assembled correctly to prevent flue gas recirculation.
If the unit shows an error code, look it up: Weil-McLain Boiler codes
Source: SVF 500/600 Series 1 Boiler Manual, p. 54. Written in our own words as a summary; always check the original manual.
General guidance for qualified technicians. The manufacturer's installation and service manual and local codes always take priority. Aurora Star Tech is not affiliated with, endorsed by or sponsored by any equipment manufacturer; brand and model names are used only to identify equipment and belong to their owners.