Weil-McLain Boiler: Bolt the boiler down to mounting blocks (seismic or code requirement)

Updated · by Aurora Star Tech Inc.

Bolt the boiler down to mounting blocks (seismic or code requirement) on a Weil-McLain boiler: Where the boiler must be anchored, remove the casters and bolt the base to mounting blocks through the existing base holes.

Homeowner with a boiler problem? Call (647) 657-2977 or book a service call — licensed technicians across Vaughan and the GTA.

Applies to: SlimFit 1000-2000 Series 2 boilers

How to fix bolt the boiler down to mounting blocks (seismic or code requirement): step by step

  1. Remove the casters.
  2. Bolt the boiler base to mounting blocks using the existing holes in the base.
  3. Make sure the blocks hold at least 5¼ inches between the base bottom and the floor.
  4. Verify the final mounting meets seismic, structural and other applicable codes and engineering practice.
Safety: Gas, electrical and refrigerant work must be done by a licensed technician. Turn off power and gas before servicing, never bypass a safety control, and always follow the manufacturer's manual for your exact model.

If the unit shows an error code, look it up: Weil-McLain Boiler codes

Source: SlimFit Series 2 Boiler Manual, p. 12. Written in our own words as a summary; always check the original manual.

General guidance for qualified technicians. The manufacturer's installation and service manual and local codes always take priority. Aurora Star Tech is not affiliated with, endorsed by or sponsored by any equipment manufacturer; brand and model names are used only to identify equipment and belong to their owners.