Weil-McLain Boiler: Boiler location and installation checks
Boiler location and installation checks on a Weil-McLain boiler: Check the site before setting the boiler. Gas controls must be protected from dripping or spraying water and rain.
Applies to: All SlimFit Series 2 models
How to fix boiler location and installation checks: step by step
- Confirm nearby system water, venting, gas, electrical power and condensate drain connections.
- Remove combustible materials, gasoline and flammable liquids from the area.
- Never install on carpeting, even on a foundation.
- Verify the mounting surface is level and rated for the load.
- Mount the boiler above floor height as required in garages and protect it from vehicle damage.
- If replacing an existing boiler, correct oxygen-causing leaks, undersized expansion tank and lack of freeze protection first.
If the unit shows an error code, look it up: Weil-McLain Boiler codes
Source: SlimFit Series 2 boiler manual, p. 6. Written in our own words as a summary; always check the original manual.
General guidance for qualified technicians. The manufacturer's installation and service manual and local codes always take priority. Aurora Star Tech is not affiliated with, endorsed by or sponsored by any equipment manufacturer; brand and model names are used only to identify equipment and belong to their owners.