Warming things up…Dialing in your comfort…Almost cozy…
Reliable Heating and Cooling Solutions – Quality Service, Fair Prices, Guaranteed Satisfaction!

Viessmann General: Wire the 120VAC unit to the control and BMS

Updated · by Aurora Star Tech Inc.

Wire the 120VAC unit to the control and BMS on a Viessmann general: The 120VAC wall unit connects to the solar control with a supplied CAT-5 cable, to the BMS with BACnet IP, and to 120VAC power.

Homeowner with a heating or cooling system problem? Call (647) 657-2977 or book a service call — licensed technicians across Vaughan and the GTA.

Applies to: Versatronik 535 Solar/BACIP Wall Mount, 704065

How to fix wire the 120vac unit to the control and bms: step by step

  1. Plug the supplied CAT-5 cable RJ45 into the gateway and the other end into the solar control.
  2. Connect the BACnet IP network to the BMS.
  3. Connect the standard plug-in 120VAC power supply to the gateway.
Safety: Gas, electrical and refrigerant work must be done by a licensed technician. Turn off power and gas before servicing, never bypass a safety control, and always follow the manufacturer's manual for your exact model.

Source: Versatronik 535 Solar BACnet IP manual, p. 8. Written in our own words as a summary; always check the original manual.

General guidance for qualified technicians. The manufacturer's installation and service manual and local codes always take priority. Aurora Star Tech is not affiliated with, endorsed by or sponsored by any equipment manufacturer; brand and model names are used only to identify equipment and belong to their owners.

Emergency HVAC Service

647-657-2977