Viessmann Boiler: Wall and frame mounting of the boiler
Wall and frame mounting of the boiler on a Viessmann boiler: Free-standing or wall-mounted install using the boiler stand or wall bracket. No mounting template is supplied, so the wall positions for the frame, bracket and vents must be calculated in the field.
Applies to: Vitodens 200-W B2HA 45, 60
How to fix wall and frame mounting of the boiler: step by step
- Fasten the boiler stand securely to the floor. Viessmann recommends concrete expansion anchors (Hilti KB-TZ, size partly garbled in the manual).
- Fasten the wall mounting bracket, supplied with the boiler, to the mounting frame with the supplied hardware. Keep the bracket level.
- Move the frame into position and secure it to the floor, and to the wall if needed.
- Remove the external accessories connection box cover.
- Loosen the bottom boiler screws without removing them.
- Remove the front enclosure panel by lifting it up and pulling it away from the boiler.
- Hang the boiler on the mounting bracket and make sure it is secure. Fit the holding bracket to the frame over the top of the boiler.
- Adjust the levelling screws until the boiler is level.
- Connect the boiler to the installation fittings.
If the unit shows an error code, look it up: Viessmann Boiler codes
Source: Vitodens 200-W B2HA 45, 60 Installation Instructions, p. 16-17. Written in our own words as a summary; always check the original manual.
General guidance for qualified technicians. The manufacturer's installation and service manual and local codes always take priority. Aurora Star Tech is not affiliated with, endorsed by or sponsored by any equipment manufacturer; brand and model names are used only to identify equipment and belong to their owners.