Warming things up…Dialing in your comfort…Almost cozy…
Reliable Heating and Cooling Solutions – Quality Service, Fair Prices, Guaranteed Satisfaction!

Viessmann Boiler: Use a 1 in. full port drain if local code requires it

Updated · by Aurora Star Tech Inc.

Use a 1 in. full port drain if local code requires it on a Viessmann boiler: The boiler has a 1 in. wash-out opening that is reduced to a ¾ in. fill/drain faucet. If local codes need a full-port drain, a 1 in. field-supplied tee is installed at the wash-out opening.

Homeowner with a boiler problem? Call (647) 657-2977 or book a service call — licensed technicians across Vaughan and the GTA.

Applies to: Boiler wash-out and drain

How to fix use a 1 in. full port drain if local code requires it: step by step

  1. Connect the ¾ in. fill/drain faucet with a 1 in. x ¾ in. reducing coupling.
  2. If local code requires a full-port drain, fit a 1 in. tee at the wash-out opening.
Safety: Gas, electrical and refrigerant work must be done by a licensed technician. Turn off power and gas before servicing, never bypass a safety control, and always follow the manufacturer's manual for your exact model.

If the unit shows an error code, look it up: Viessmann Boiler codes

More other tips for boiler

Source: Vitorond 200, VD2A Series Installation, p. 22. Written in our own words as a summary; always check the original manual.

General guidance for qualified technicians. The manufacturer's installation and service manual and local codes always take priority. Aurora Star Tech is not affiliated with, endorsed by or sponsored by any equipment manufacturer; brand and model names are used only to identify equipment and belong to their owners.

Emergency Boiler Repair

647-657-2977