Warming things up…Dialing in your comfort…Almost cozy…
Reliable Heating and Cooling Solutions – Quality Service, Fair Prices, Guaranteed Satisfaction!

Viessmann Boiler: Primary pump placement for DHW storage tank layout

Updated · by Aurora Star Tech Inc.

Primary pump placement for DHW storage tank layout on a Viessmann boiler: In system layout 3 the primary pump must pump into the boiler, as illustrated in the manual. The boiler is paired with closely spaced tees or a low-loss header.

Homeowner with a boiler problem? Call (647) 657-2977 or book a service call — licensed technicians across Vaughan and the GTA.

Applies to: Vitodens 100-W WB1B 26 and 35 with DHW storage tank and one heating circuit

How to fix primary pump placement for dhw storage tank layout: step by step

  1. Install the primary pump (L) so it pushes water into the boiler.
  2. Use closely spaced tees (4x pipe diameter or 12 in / 305 mm) only if a low-loss header is not fitted.
Safety: Gas, electrical and refrigerant work must be done by a licensed technician. Turn off power and gas before servicing, never bypass a safety control, and always follow the manufacturer's manual for your exact model.

If the unit shows an error code, look it up: Viessmann Boiler codes

Source: Vitodens 100-W, WB1B installation manual, p. 40. Written in our own words as a summary; always check the original manual.

General guidance for qualified technicians. The manufacturer's installation and service manual and local codes always take priority. Aurora Star Tech is not affiliated with, endorsed by or sponsored by any equipment manufacturer; brand and model names are used only to identify equipment and belong to their owners.

Emergency Boiler Repair

647-657-2977