Warming things up…Dialing in your comfort…Almost cozy…
Reliable Heating and Cooling Solutions – Quality Service, Fair Prices, Guaranteed Satisfaction!

Viessmann Boiler: Mounting the wall bracket on wood or metal studs

Updated · by Aurora Star Tech Inc.

Mounting the wall bracket on wood or metal studs on a Viessmann boiler: Studs must support 155 lb (72 kg). A cross bar or frame may be needed for reinforcement. The metal-stud pilot hole size is not legible in this copy.

Homeowner with a boiler problem? Call (647) 657-2977 or book a service call — licensed technicians across Vaughan and the GTA.

Applies to: Vitodens 200-W B2HA 45, 60 wall mounting

How to fix mounting the wall bracket on wood or metal studs: step by step

  1. For wood studs, drill 3/16 in. pilot holes centred in each stud.
  2. Secure the bracket to the wood studs with bolts.
  3. For metal studs, drill pilot holes centred in each stud (size not legible in this copy) and use fasteners not supplied with the boiler.
  4. Confirm the bracket is level.
  5. Add a cross bar or frame if the studs need reinforcement.
Safety: Gas, electrical and refrigerant work must be done by a licensed technician. Turn off power and gas before servicing, never bypass a safety control, and always follow the manufacturer's manual for your exact model.

If the unit shows an error code, look it up: Viessmann Boiler codes

Source: Vitodens 200-W B2HA 45, 60 Installation Instructions, p. 13-14. Written in our own words as a summary; always check the original manual.

General guidance for qualified technicians. The manufacturer's installation and service manual and local codes always take priority. Aurora Star Tech is not affiliated with, endorsed by or sponsored by any equipment manufacturer; brand and model names are used only to identify equipment and belong to their owners.

Emergency Boiler Repair

647-657-2977