Warming things up…Dialing in your comfort…Almost cozy…
Reliable Heating and Cooling Solutions – Quality Service, Fair Prices, Guaranteed Satisfaction!

Viessmann Boiler: Mount the wall bracket on concrete or brick

Updated · by Aurora Star Tech Inc.

Mount the wall bracket on concrete or brick on a Viessmann boiler: The enclosed screws and plastic anchors suit concrete only. Other materials need fixings rated for 115 lb (52 kg).

Homeowner with a boiler problem? Call (647) 657-2977 or book a service call — licensed technicians across Vaughan and the GTA.

Applies to: Concrete or brick walls

How to fix mount the wall bracket on concrete or brick: step by step

  1. Drill 12 mm holes in the concrete or brick wall.
  2. Install the rawl plugs and screw the bracket to the wall.
  3. Check the bracket is level.
  4. Fasten the bracket tightly and securely, since a loose boiler is a severe safety hazard.
Safety: Gas, electrical and refrigerant work must be done by a licensed technician. Turn off power and gas before servicing, never bypass a safety control, and always follow the manufacturer's manual for your exact model.

If the unit shows an error code, look it up: Viessmann Boiler codes

Models

Vitodens 200-W B2HB 45Vitodens 200-W B2HB 57Vitodens 200-W B2HB 160Vitodens 200-W B2HB 199

Source: Vitodens 200-W B2HB 19 to 35, 68 to 125 installation instructions, p. 13. Written in our own words as a summary; always check the original manual.

General guidance for qualified technicians. The manufacturer's installation and service manual and local codes always take priority. Aurora Star Tech is not affiliated with, endorsed by or sponsored by any equipment manufacturer; brand and model names are used only to identify equipment and belong to their owners.

Emergency Boiler Repair

647-657-2977