Viessmann Boiler: Hydrostatic pressure test of the boiler
Hydrostatic pressure test of the boiler on a Viessmann boiler: Pressure test the boiler before it is connected to piping or power. Hold 4 bar (60 psig) for 15 minutes and look for leaks.
Applies to: Boiler pressure test
Common causes of hydrostatic pressure test of the boiler
- Gauge reading drops below test pressure, indicating water loss through a leak
How to fix hydrostatic pressure test of the boiler: step by step
- Cap the supply and return connections (3/4 in NPT male).
- Connect a 1/2 in garden hose to the boiler drain valve and fill slowly until the gauge reads 4 bar (60 psig).
- Hold pressure for 15 minutes and do not leave the boiler unattended.
- Inspect all joints and safety devices with a flashlight for leaks.
- Repair every leak found.
- After 15 minutes, open the drain valve slowly to release water.
- Remove the caps and install the pressure relief valve in place of the 3/4 in cap.
- Check the fill procedure before running the boiler.
If the unit shows an error code, look it up: Viessmann Boiler codes
Source: Vitodens 100-W WB1B installation manual, p. 23. Written in our own words as a summary; always check the original manual.
General guidance for qualified technicians. The manufacturer's installation and service manual and local codes always take priority. Aurora Star Tech is not affiliated with, endorsed by or sponsored by any equipment manufacturer; brand and model names are used only to identify equipment and belong to their owners.