Trane General: Add a period to the schedule
Add a period to the schedule on a Trane general: Insert a new period at one of the plus signs on the schedule.
Applies to: XL1050 control
How to fix add a period to the schedule: step by step
- Select ADD PERIOD.
- Select the green plus circle where the new period should start.
- Choose a predefined name, or select NEW to enter a custom name and select NEXT.
- Select NEXT, then APPLY to save and return to the schedule.
If the unit shows an error code, look it up: Trane General codes
Source: XL1050 User Guide (32-5093-04B-EN), p. 23. Written in our own words as a summary; always check the original manual.
General guidance for qualified technicians. The manufacturer's installation and service manual and local codes always take priority. Aurora Star Tech is not affiliated with, endorsed by or sponsored by any equipment manufacturer; brand and model names are used only to identify equipment and belong to their owners.