Warming things up…Dialing in your comfort…Almost cozy…
Reliable Heating and Cooling Solutions – Quality Service, Fair Prices, Guaranteed Satisfaction!

Other: Boiler tips (part 39 of 45)

Updated · by Aurora Star Tech Inc.

Short, practical technician tips on other for boiler. Check each one against the manual for your exact model before acting.

Avoid petroleum-based compounds in the system

Weil-McLain · All Ultra Series 4 models

Petroleum-based cleaning or sealing compounds can damage gaskets and seals in the system and cause property damage.

  1. Use only water-compatible cleaners and sealers in the boiler system.

Bird screens and vent connections for direct exhaust

Weil-McLain · Direct exhaust and direct vent

Bird screens are not supplied and must be bought separately, and each Ultra needs its own vent.

  1. Install a bird screen in every vent pipe termination.
  2. Buy bird screens separately from WM Technologies.
  3. Use the same vent material throughout; do not mix piping types.
  4. Do not connect any other appliance to a boiler vent pipe.
  5. Do not connect multiple boilers to a common vent pipe.

Bird screens are purchased separately

Weil-McLain · All direct vent terminations

Bird screens are not included with the vent terminations and must be bought separately. Part numbers are on the parts list at the end of the manual.

  1. Order bird screens separately before installing terminations.
  2. Install a bird screen in each vent and air termination.

Bird screens at vent terminations

Weil-McLain · All vent terminations

Each vent termination needs a bird screen from the vent manufacturer. Do not use a generic screen.

  1. Buy the bird screen from the vent or air piping supplier.
  2. Install one bird screen at each vent termination.

Bluetooth status and FCC/IC information

Weil-McLain · ECO Tec control with Bluetooth

Bluetooth can be turned on or off, and the FCC and IC identifiers are shown on the Bluetooth screen.

  1. Swipe right from HOME.
  2. Press BLUETOOTH to view or change status.
  3. Read FCC and IC information on the same screen if needed.

Boiler circulator relay rating

Weil-McLain · Boiler circulator wiring

The expansion module relay that drives the boiler pump has a 10 A maximum rating.

  1. Use external 120VAC single phase power for the pump, sized for the pump load.
  2. Interrupt the pump hot line or enable circuit at the EP7 rear terminal block.
  3. Keep the pump load within the 10 A relay limit.

Boiler information screen readouts

Weil-McLain · ECO Tec control, all models

The information screen shows live status and temperatures. Items include the sequence status and active priority, each input status, 0-10V input value, pump and aux outputs, additional heat demand, combi DHW flow and temperature, outdoor temperature, system supply and return, boiler out and in, target temperature, and blower modulation rate. Some readouts appear only on combi models or when the feature is selected.

  1. Swipe left or press the right-side bubble next to the home symbol to open the boiler information screen.
  2. Check the status, input status and modulation rate when diagnosing operation.

Boiler location and installation precautions

Weil-McLain · SVF 1500-3000 Series 1

Keep gas controls protected from dripping or spraying water. Never install on carpet, even over a foundation. Combustible flooring is allowed. Keep the area clear of combustible materials, gasoline and flammable liquids. In a garage, mount the boiler at the height required by the fuel gas code and protect it from vehicles.

  1. Check nearby water piping, venting, gas, electrical power and condensate drain location before placing the boiler.
  2. Keep combustion and ventilation air openings unblocked.
  3. Install in a garage only at the code-required height and protected from moving vehicles.

Boiler receptacle and output ratings

Weil-McLain · Evergreen Pro Series 2 boilers

Electrical limits for the on-board receptacle and the 120 VAC outputs.

  1. The boiler right-side receptacle is rated 2.0 A max at 120 VAC. It can power a condensate pump.
  2. Each circulator output is rated 2.0 A max. The 120 VAC auxiliary outputs are also limited to 2.2 A.
  3. For any voltage other than 120 VAC, or for loads above these ratings, use an external relay.

Boiler room negative pressure and exhaust fans

Weil-McLain · SVF 1500-3000 Series 1

The appliance space must never be under negative pressure unless all appliances are direct vent. Air openings must also handle the airflow of any exhaust fans or air movers that draw from the space.

  1. Size air openings for the boiler firing rate and for all exhaust fans or air movers drawing from the space.
  2. Do not let exhaust fans or mechanical ventilation pull the room into negative pressure.

Boiler water after water contact

Weil-McLain · All listed boiler series

Do not run the boiler if any part of the boiler, burner or controls has been sprayed or submerged. Saltwater or polluted water contact voids warranty. Electrical components or wiring contacted by water require boiler replacement.

  1. Do not operate the boiler if water has contacted any part of the boiler, burner or controls.
  2. Replace the boiler or completely repair and inspect it before operation.
  3. Replace the boiler if wiring or electrical components were in contact with water.
  4. Replace the boiler if it was contaminated with saltwater or polluted water.

Boiler water chemistry and make-up water

Weil-McLain · All listed boiler series

Water chemistry should be checked at least annually. Fresh make-up water and oxygen shorten boiler life. Mineral buildup reduces heat transfer and causes failure.

  1. Have the boiler water chemistry checked at least once a year by a qualified technician.
  2. Repair leaks in the boiler or piping at once to stop make-up water.
  3. Do not use petroleum-based cleaning or sealing compounds.
  4. Do not use homemade cures or boiler patent medicines.
  5. Never use automotive or standard glycol antifreeze, including hydronic glycol.
  6. Do not add cold water to a hot boiler, because thermal shock can crack the heat exchanger.

Boiler water chemistry and makeup water

Weil-McLain · Water boilers

Do not use petroleum-based cleaning or sealing compounds, which damage gaskets and seals. Do not use homemade cures or boiler patent medicines. Constant fresh makeup water shortens boiler life: mineral build-up overheats cast iron and oxygen causes internal corrosion. Repair leaks in the boiler or piping right away.

  1. Do not use petroleum-based cleaners or sealers in the boiler system.
  2. Do not add homemade cures or patent medicines.
  3. Repair leaks at once to limit makeup water.

Boiler water quality and system fill

Weil-McLain · ECO Tec Series 3 hydronic piping and fill

The stainless steel heat exchanger needs water chemistry inside the manual limits. Scale, sediment, make-up water and oxygen all shorten boiler life.

  1. Flush the system thoroughly before connecting the boiler to remove sediment.
  2. Install a strainer or other sediment removal device if needed.
  3. Check water chemistry against the limits in the manual and add chemical treatment if needed (see page 130).
  4. Do not use petroleum-based cleaning or sealing compounds in the system.
  5. Repair leaks at once to limit make-up water.
  6. Use the boiler only in a closed-loop system.
  7. Never add cold water to a hot boiler, to avoid cracking the heat exchanger.

Breeching installation rules

Weil-McLain · All Series 7 boilers

Sizing and slope rules for the breeching from the draft hood or damper outlet to the chimney or vent.

  1. Use breeching the same size as the draft hood or damper outlet.
  2. Run vertical to the outside where possible for best performance.
  3. For horizontal runs, slope upward at least 1/4 in. per lineal foot toward the chimney or vent.
  4. Support horizontal breeching with hangers to prevent sagging.
  5. Do not connect the breeching to any part of a mechanical draft system under positive pressure.

Built-in zone control: up to four inputs and four outputs

Weil-McLain · ECO Tec Series 3 boilers with Unity 2.0 control

The boiler control runs up to four circulators without an external zone control. It supports up to four inputs and four outputs.

  1. Plan the zone wiring for up to four inputs and four outputs.
  2. Check each zone circulator output against the zone naming before finishing setup.

Carbon monoxide alarm and installer requirements

Weil-McLain · Installation and annual service

The installer must confirm a working CO alarm before the boiler is put into use.

  1. Confirm at least one carbon monoxide alarm is installed and working in the living space or home, per the alarm maker's instructions and local codes, before starting the boiler.
  2. Have the installer read all manual and shipped instructions before installing, and follow steps in the order given.
  3. Record the CP number on the installation certificate on page 186 if it is not already shown.
  4. Have the boiler serviced and inspected by a qualified technician at least once a year.

Carbon monoxide detector

Weil-McLain · Ultra Series 4 boilers

A CO detector on the same circuit as the boiler is strongly recommended. The installer must confirm at least one CO alarm is installed and working in the living space before the boiler is put into service.

  1. Install a CO alarm in the living space per the alarm maker's instructions and local codes.
  2. Confirm the alarm works before starting the boiler.

Ceramic fiber handling

Weil-McLain · All Ultra Series 4 boilers

The boiler contains ceramic fiber materials that need careful handling.

  1. Read the ceramic fiber warning on page 109 before handling or disposing of ceramic fiber materials.
  2. Handle insulation and cover plate materials with care.

Ceramic fiber handling during cover plate and burner work

Weil-McLain · ECO Tec Series 3 gas boilers

Cover plate components, refractory insulation and gaskets contain ceramic fiber that can be hazardous to breathe.

  1. Avoid breathing dust and avoid skin and eye contact.
  2. Wear an N95 NIOSH-certified respirator or the respirator required for the site.
  3. Wear long-sleeved loose clothing, gloves and eye protection.
  4. Handle carefully to limit dust from abrasion.
  5. Place removed refractory in a sealed plastic bag for disposal.
  6. Wash contaminated clothes separately and rinse the washer thoroughly.

Ceramic fiber materials inside the boiler

Weil-McLain · ECO Tec series 3 80/110/150/199

The boiler contains ceramic fiber materials. Handle them carefully and follow the handling instructions on page 139.

  1. Follow the ceramic fiber handling instructions on page 139 before handling these materials.

CGa component locations

Weil-McLain · CGa boiler

Numbered components on the CGa boiler diagram.

  1. Gas valve
  2. Pilot burner (not shown)
  3. Main burners
  4. Gas manifold/orifices
  5. Control module
  6. Vent damper
  7. Water temperature/LWCO sensor
  8. Transformer
  9. Spill switch
  10. Rollout thermal fuse element
  11. Draft hood
  12. Circulator
  13. Relief valve
  14. Gauge (pressure/temperature)
  15. Drain valve

CGi component locations

Weil-McLain · CGi boiler

Numbered components on the CGi boiler diagram.

  1. Gas valve
  2. Pilot burner (not shown)
  3. Main burners
  4. Gas manifold/orifices
  5. Control module
  6. Inducer
  7. Water temperature/LWCO sensor
  8. Transformer
  9. Air pressure switch
  10. Rollout thermal fuse element
  11. Circulator
  12. Relief valve
  13. Gauge (pressure/temperature)
  14. Drain valve

Check domestic hot water temperatures

Weil-McLain · All ECO Tec Series 3 models with domestic hot water

Check the thermostatic mixing valve at all domestic hot fixtures to confirm correct temperatures, using the procedure on page 137. If a recirculation loop is installed, confirm the recirculation pump works. Also check the aquastat, timer or occupancy sensor if one is used.

  1. Check the thermostatic mixing valve at each domestic hot fixture per page 137.
  2. Confirm the recirculation pump runs, if a loop is installed.
  3. Check the aquastat, timer or occupancy sensor if used.

Check system status summary screen

Weil-McLain · ECO Tec Control, ECO Tec Series 3

The summary screen shows current boiler operation. Use it to confirm the settings you chose match what is installed.

  1. Swipe left or press the right bubble beside the home symbol to open the summary screen.
  2. Check status, demand, input status, pump/aux state, outdoor temperature, supply/return and boiler out/in temperatures, and modulation rate.
  3. If any value does not match the setup, press that item and correct it.

Check the boiler relief valve

Weil-McLain · Boiler relief valve, all ECO Tec Series 3 models

Inspect the relief valve and lift the lever to confirm flow. Before lifting the lever, make sure a discharge line is connected to a safe drain, because hot water will come out. If no water flows, the valve is inoperative and the boiler must stay shut down until a new valve is installed. Relief valves must be inspected by a licensed plumbing contractor or authorized inspection agency at least every three years, and the lever must be operated at least once a year. If the valve weeps or will not seat, replace it, but first confirm the cause is the valve and not over-pressurization from a waterlogged or undersized expansion tank.

  1. Confirm the discharge line is piped to a safe disposal point.
  2. Lift the lever and check that water flows.
  3. If no water flows, shut the boiler down and replace the relief valve.
  4. If the valve weeps or will not seat, check the expansion tank before replacing the valve.
  5. Remind the owner that the lever must be operated at least once a year.

Check the combi 3-way valve and DHW function

Weil-McLain · Combi models only

Applies to combi models only. Cycle the 3-way valve by calling for space heat, then calling for domestic hot water at a faucet. The valve and boiler should switch from space heating to domestic and hot water should be delivered. If the change does not happen, run the 3-way valve test listed on page 143. Also check for water leaks at the 3-way valve, the brazed plate and the brazed plate manifold fittings.

  1. Start a space heating call to the boiler.
  2. Open a domestic hot water faucet to create a DHW call.
  3. Confirm the valve and boiler operation change to domestic and hot water is delivered.
  4. If the change does not happen, run the 3-way valve test on page 143.
  5. Check the 3-way valve, brazed plate and manifold fittings for leaks.

Check U-Control date and time

Weil-McLain · Ultra Series 4 U-Control display

Confirm the time on the U-Control display is correct.

  1. Check the time shown on the U-Control display.
  2. If the time is wrong, set the correct date and time as shown on pages 10 and 11 of the manual.

Check valve on DHW mixing valve outlet

Weil-McLain · Combi DHW piping

Reverse flow can open the flow switch after a draw ends, so a check valve is required.

  1. Install a field supplied check valve on the outlet of the mixing valve.
  2. Confirm the flow switch does not activate after the cold draw ends.

Choose operating instructions by gas valve

Weil-McLain · CGa, EG, PEG, LGB spark-ignited pilot models

The operating instructions depend on the boiler series and the gas valve installed. Spark-ignited pilot boilers are covered in this manual.

  1. Identify the boiler model and series from the rating label.
  2. For CGa-25 to CGa-8, EG-30 to EG-75 and PEG-30 to PEG-65 with spark-ignited pilot and Resideo VR8204 or VR8304 gas valve, use the operating instructions on p. 6.
  3. For LGB Series 2, use the instructions on p. 7.
  4. For LGB Series 3, use the instructions on p. 8.
Safety: Gas, electrical and refrigerant work must be done by a licensed technician. Turn off power and gas before servicing, never bypass a safety control, and always follow the manufacturer's manual for your exact model.

General guidance for qualified technicians. The manufacturer's installation and service manual and local codes always take priority. Aurora Star Tech is not affiliated with, endorsed by or sponsored by any equipment manufacturer; brand and model names are used only to identify equipment and belong to their owners.

Emergency Boiler Repair

647-657-2977