Charging and recharging requirements for flammable refrigerant
Carrier · D5FSOAH systems using flammable refrigerant
Follow normal charging practice plus the flammable refrigerant rules. Avoid overfilling. The system must be leak tested after charging and again before leaving the site.
- Use only tools rated for flammable refrigerant, and keep hoses as short as possible.
- Keep refrigerant cylinders upright and make sure the system is earthed before charging.
- Before recharging, pressure test with oxygen-free nitrogen (OFN).
- Do not charge refrigerant into a system that is not clean and checked. Never use compressed air or oxygen for purging.
- Label the system once charging is complete.
- Carry out a leak test after charging and before commissioning, and repeat it before leaving the site.
Condensate drain
Carrier · Indoor unit condensate drain
Drain must meet local sanitation codes.
- Install drains to meet local sanitation codes.
- If adequate gravity drainage cannot be provided, fit the accessory condensate pump.
- Check the drain size in the specifications table.
Condensate drain trap and slope
Carrier · Indoor unit condensate drain
Negative pressure at the drain connection needs a trap.
- Install a drain trap as close to the unit as possible.
- Keep the top of the trap below the drain pan connection so the pan drains fully.
- Pitch the drain line 1/8 in per foot.
- Keep the drain outlet at least 1.9 in (5 cm) above the ground.
- On horizontal runs, install an anti-siphon air vent (standpipe) ahead of the run.
- Screw seal plugs in by hand only. Incorrect drain setup can flood the unit.
Confirm interunit wiring before power-up
Carrier · D5CURA single zone systems
Record whether there were any breaks, splices, wire nuts or butt connectors between the outdoor and indoor units. Also confirm that the outdoor port wiring goes to the correct indoor unit.
- Record the wire size and type used.
- Check the run between the outdoor unit and the indoor unit for breaks, splices, wire nuts or butt connectors.
- Verify that the wiring from the outdoor unit port goes to the correct indoor unit.
- Record the answers on the checklist.
Crankcase heater clamp placement
Carrier · D5CMHA outdoor units, all sizes
The crankcase heater is standard on all sizes. Its clamps must be placed around the compressor oil sump.
- Confirm the crankcase heater is fitted on the unit.
- Place the heater clamps around the compressor oil sump.
Drain hose routing
Carrier · D5FSHA sizes 6K to 36K
Correct drain hose placement prevents water traps and overflow.
- Attach the drain hose on the same side the refrigerant piping exits the unit.
- Put the drain hose at the bottom of the pipe bundle.
- Keep the hose free of kinks and dents.
- Do not place the hose end in water or in containers that collect water.
- Wrap the indoor section of the hose with foam pipe insulation.
- Plug any unused drain hole with the rubber plug provided.
- Pour a small amount of water into the drain pan to confirm smooth flow.
Electrical supply requirements
Carrier · All field wiring
Limits on supply voltage, disconnects and grounding for the installation.
- Keep supply voltage within 90-110% of rated voltage.
- Use an all-pole disconnect with at least 1/8 in (3 mm) contact separation.
- Use an RCD rated at 30 mA or less where required.
- Give the unit its own branch circuit. Do not share it with other appliances.
- Ground the unit and check that every terminal wire is firmly connected.
- Turn off power and wait at least 10 minutes before touching electrical components.
- Connect outdoor wires before indoor wires.
Evacuation check after pulling vacuum
Carrier · Split system field piping
The system must reach the required vacuum before it is checked for holding. The vacuum target is the lower of 500 microns or the level required by local code.
- Pull the system down to the specified vacuum level or lower.
- Isolate the system from the vacuum pump.
- Confirm the pressure does not rise above 1500 microns within 10 minutes.
Evacuation method and vacuum hold
Carrier · D5CURA refrigerant circuit
Evacuate the system with either the triple evacuation method or the deep vacuum method, as described in the installation manual. For deep vacuum, the system must hold 500 microns for 1 hour.
- Choose triple evacuation or deep vacuum, as described in the installation manual.
- If using deep vacuum, pull the system down to 500 microns.
- Close the valves and confirm the system holds 500 microns for 1 hour.
- Confirm the line set diameter matches the evaporator connections.
- Record each answer on the checklist.
Field piping pressure test and evacuation limits
Carrier · Field refrigerant piping of D5FSOAH systems
Field refrigerant piping must be pressure tested with inert gas, then vacuum tested, before charging. Indoor field joints also need a tightness test.
- Pressure test field piping with inert gas. The low side is tested to its design pressure. The high side is tested to its design pressure, unless it cannot be isolated from the low side; then test the whole system to the low side design pressure.
- Hold the test pressure for at least 1 hour with no drop on the gauge. Gauge resolution must not exceed 5% of test pressure.
- Evacuate to the vacuum level given in the manual or lower. The lower of 500 microns or the local code value applies.
- Isolate the pump and check that pressure does not rise above 1500 microns within 10 minutes.
- Test indoor field-made joints with a detector sensitive to 5 g/year of refrigerant or better, at at least 0.25 times the maximum allowable pressure. No leak is allowed.
- Do not bury more than 36 in. (914 mm) of refrigerant pipe. If any section is buried, provide a 6 in. (152 mm) vertical rise to the outdoor unit valve connections.
Field refrigerant piping pressure and vacuum test
Carrier · Split systems with field piping
Pressure test and evacuate field piping before charging. Use inert gas for the pressure test and oxygen-free nitrogen for flammable refrigerant systems. Never use air or oxygen-containing gas.
- Pressure test the low side at its design pressure and the high side at its design pressure. If the high side cannot be isolated, test the whole system at the low side design pressure.
- Hold the test pressure for at least 1 hour with no drop on the gauge. Gauge resolution must not exceed 5% of the test pressure.
- Pull a vacuum to the level in the manual, which is 500 microns or less, or the level required by local code.
- Isolate the system from the vacuum pump. The pressure must not rise above 1500 microns within 10 minutes.
- Charge by the liquid method only, and keep hoses as short as possible.
Final system checks before handover
Carrier · Indoor unit commissioning
Confirm the installation is finished and the customer is briefed before leaving site.
- Conceal tubing where possible and fasten it to the outside wall.
- Confirm the drain slopes downward along its full length.
- Confirm all tubing and connections are insulated.
- Seal the hole where cables and tubing pass through the wall.
- Check all remote buttons, the display panel lights, the air deflection louver and the drain.
- Explain operation, mode selection, timer, filter removal and cleaning, louver setting and care.
- Leave the owner's manual and installation instructions with the customer.
Flammable refrigerant R-454B service precautions
Carrier · D5FSOAH06XAK, D5FSOAH12XAK, D5FSOAH18XAK
The system uses R-454B, a flammable refrigerant. Only trained service personnel may repair it.
- Keep ignition sources out of the storage room.
- Do not puncture refrigerant tubing.
- Do not use methods to speed defrost or clean other than those the manufacturer recommends.
- Never use air or oxygen-containing gas for leak testing or running compressors.
Indoor to outdoor communication wiring
Carrier · 9K~48K
The indoor and outdoor units communicate over a nonpolar RS-485 link. The connections are polarity sensitive, and wrong polarity causes a fault code.
- Do not use thermostat wire for the indoor to outdoor connection.
- Connect the indoor and outdoor units exactly as shown in the connection diagram for the model size.
- Check polarity on the RS-485 communication pair before power-up.
Indoor unit adjustment for embedded pipes
Carrier · D5FSHA sizes 6K to 36K
The indoor unit can shift sideways to fit embedded pipes.
- If there is not enough room for embedded pipes, move the indoor unit left or right by about 1.18 to 1.95 in (30 to 50 mm), depending on model.
- Use the kickstand at the back of the unit to prop it up while connecting pipes and drain hose.
Indoor unit mounting height for flammable refrigerant
Carrier · Indoor unit installation
The indoor unit must be mounted at least 5.9 ft (1.8 m) above the floor. The room area must meet the minimum in the room area table for the charge.
- Mount the indoor unit at least 5.9 ft (1.8 m) above the floor.
- Check the charge against the room area table for the measured centre height.
- Correct the minimum area for altitude if needed.
Indoor unit placement and mounting
Carrier · Indoor fan coil installation
Position the fan coil for airflow and support.
- Level the indoor unit in all planes for reliable operation.
- Keep adequate clearance for airflow (see Fig. 11).
- Mount the unit on the floor or against an outside wall for best air circulation, centred on the wall where possible.
- Keep furniture and curtains away from the return and discharge so the unit does not short cycle or recirculate air.
- Place the unit facing the normal location of room occupants.
- Support the fan coil weight adequately; use the mounting bracket locations on the dimension drawings.
Installation height and room height limits
Carrier · Indoor unit installation
The indoor unit must be mounted at least 7.6 ft (2.3 m) above the floor. The room height must be at least 7.3 ft (2.2 m).
- Mount the indoor unit at least 7.6 ft (2.3 m) above the floor.
- Confirm the room height is at least 7.3 ft (2.2 m).
- Check the minimum room area for the system charge against the table for the installed height.
Insulate refrigerant lines
Carrier · D5FSOA system
Both refrigerant lines must be insulated.
- Insulate the gas line.
- Insulate the liquid line.
Leak test indoor field joints
Carrier · Indoor field joints
Field-made joints inside the building must be tested for tightness with a sensitivity of 5 g/year of refrigerant or better.
- Test at a pressure of at least 0.25 times the maximum allowable pressure.
- Confirm no leak is detected.
- Do not use detachable joints on the indoor side. Brazed or welded joints are acceptable.
Leave pipe ends unwrapped for leak test
Carrier · D5FSHA sizes 6K to 36K
The pipe ends must stay accessible for the final leak check.
- Wrap the pipe bundle, but leave the pipe ends unwrapped.
- Keep the connection point exposed for the leak test.
- After the leak test, wrap the connection point with insulation tape.
Minimum clearance above the indoor unit
Carrier · Indoor unit installation summary
The 45MAHA-series note gives a minimum top clearance of 2 in, with 5.9 in recommended. Mounting height is set by the installation method.
- Use at least 2 in (5.08 cm) top clearance; 5.9 in is recommended.
Nitrogen leak check
Carrier · D5CURA refrigerant piping
Hold the refrigerant piping at the specified pressure for the required time using dry nitrogen, then record the result.
- Pressurize the piping with dry nitrogen to 500 psig, not exceeding 550 psi.
- Hold the pressure for at least 30 minutes.
- Record YES or NO on the checklist.
Outdoor to indoor power and communication wiring
Carrier · D5FSFAH 9K to 16K
Power and communication run between the outdoor and indoor units. Stranded copper with 600 V insulation is required. A shielded cable can replace the signal conductors in high EMF areas.
- Size wires per NEC or CEC and local codes, using the MCA and MOCP values from the electrical data table.
- Use 14/3 stranded wire with ground, 600 V rated, for power and communication from outdoor to indoor unit.
- Connect L1 to terminal 1, N or L2 to terminal 2, and communication to terminal 3; land the green ground wire on the ground terminal.
- In high EMF areas with communication problems, use 14/2 stranded shielded wire for terminals 2 and 3 (polarity sensitive). Land the shield on ground at the outdoor unit only.
- Keep wires clear of refrigerant tubing, the compressor and moving parts, and tighten every connection.
Pre-test run checklist
Carrier · System test run
Confirm these points before switching the system on for the test run.
- Indoor and outdoor units are properly installed.
- Piping and wiring are connected correctly.
- No obstacles block the unit inlet or outlet.
- Refrigeration system has no leaks.
- Drainage runs freely to a safe location.
- Heating insulation is installed.
- Ground wires are connected.
- Piping length and any added refrigerant charge are recorded.
- Supply voltage is correct for the unit.
Pressure test and evacuation values
Carrier · Leak test and evacuation before charging
Values from the piping and start-up checklist. The pages disagree on the test time.
- Pressure test with dry nitrogen to a maximum of 500 psig.
- Hold the test for at least 60 minutes (p. 25). The start-up checklist lists a 30-minute hold with a 550 psig maximum (p. 50).
- Evacuate with the triple or deep vacuum method.
- Confirm the system holds 500 microns for 1 hour.
Pressure test field piping before charging
Carrier · Split system field piping
Field piping must be pressure tested with inert gas before the vacuum and refrigerant charge. Never use air or oxygen-containing gases for leak testing.
- Pressure test the low side at the low side design pressure and the high side at the high side design pressure.
- If the high side cannot be isolated from the low side, test the whole system to the low side design pressure.
- Hold the test pressure for at least 1 hour with no drop on the gauge.
- Use a gauge with resolution no coarser than 5% of the test pressure.
- Use inert gas only. Do not use compressed air or oxygen.
Record error codes at start-up
Carrier · D5CURA system
Check for error codes at start-up. The checklist asks whether any were present, and the outdoor, indoor, wall controller and 24V interface entries are used to record them.
- Check the outdoor unit, indoor unit, wall controller and 24V interface for error codes.
- Record any codes in the matching field on the checklist.
- Write YES or NO to the start-up error code question.
Record single zone liquid line data
Carrier · D5CURA single zone piping
For single zone piping, measure the liquid line length and calculate the additional refrigerant charge. Record the size, length and charge for each port.
- Measure the liquid pipe length.
- Calculate the additional charge for that length.
- Record the liquid line size, length and charge on the checklist for each port.
Refrigerant line installation rules
Carrier · Interconnecting refrigerant tubing
Limits for buried lines, rise to service valves and insulation thickness.
- Do not bury refrigerant lines directly in the ground.
- If lines must be buried, bury no more than 36 in (914 mm).
- Give the buried run a minimum 6 in (152 mm) vertical rise to the service valves to prevent refrigerant migration.
- Insulate both lines with at least 1/2 in (12.7 mm) thick insulation; closed-cell is recommended for long lines.
- Isolate the interconnecting tubing from the building structure so vibration and noise are not carried into it.
- Outdoor units ship with a full charge of R-454B refrigerant.
General guidance for qualified technicians. The manufacturer's installation and service manual and local codes always take priority. Aurora Star Tech is not affiliated with, endorsed by or sponsored by any equipment manufacturer; brand and model names are used only to identify equipment and belong to their owners.