Network priority settings are set from the master

Weil-McLain · Multi-boiler Evergreen Series 2 networks

Each of the four inputs on the master or any shadow can be assigned as Network Priority 1 or 2, or Local Priority 1 or 2. Network priorities are shared by all boilers.

  1. Assign each input on each boiler as Network or Local priority.
  2. Make all Network Priority changes from the master boiler only.

Never combine vent piping

Weil-McLain · Multiple Evergreen boilers with combined air

Only combustion air piping may be combined on a manifold. Combined vent piping causes flue gas leakage and boiler component damage.

Outdoor sensor mounting and wiring

Weil-McLain · Outdoor reset and WWSD

The outdoor sensor ships with the boiler. It is not required, but it must be installed to use WWSD or outdoor reset. Mount it out of direct sun and away from other heat or cooling sources. Thermostat wire is acceptable.

  1. Mount the sensor on an exterior wall, shielded from sun and from heat or cooling sources.
  2. Connect the sensor leads to P10 terminals 1 and 2.
  3. Use thermostat wire if needed.

Outdoor sensor requirement

Weil-McLain · ECO Tec 80/110/150/199 Series 3

The outdoor sensor supplied with the boiler must be installed unless one of the listed exemptions applies.

  1. Install the supplied outdoor sensor.
  2. Only skip it if an exemption in the manual applies.

Outdoor temperature sensor notice

Weil-McLain · SVF control startup with outdoor reset

An outdoor sensor is required by federal regulation unless the system qualifies for an exemption listed in the manual.

  1. At startup, answer the IS THE SYSTEM EXEMPT question.
  2. If not exempt, install the outdoor temperature sensor before continuing.
  3. Check the manual exemption conditions if unsure.

Outdoor temperature sensor requirement

Weil-McLain · SVF 500/600 Series 1

An outdoor temperature sensor must be installed to meet federal regulations unless the system is exempt. The exemption conditions are in the boiler manual, not on these pages.

  1. At the ODT sensor notice, answer whether the system is exempt.
  2. If not exempt, install the outdoor sensor.
  3. If exempt, confirm the exemption against the exemption conditions in the manual.

Pitch, support and clearance of vent and air piping

Weil-McLain · Direct vent piping

Correct slope and support keep condensate draining back to the boiler and keep the pipe away from combustibles.

  1. Slope vent and air piping continuously toward the boiler at least 1/4 inch per foot of run.
  2. Avoid any sags along the run.
  3. Keep at least 3/16 inch clearance between vent pipe and any combustible wall or material.
  4. Install pipe supports as shown in the figures for the termination type.
  5. Seal wall and floor penetrations per local code.

Power supply and grounding before energising

Weil-McLain · SVF 500/600 Series 1 boilers

Use a fused disconnect or service switch sized to code. Size the 120 Vac supply wiring from the total load sheet, and add a surge suppressor if possible. Ground the boiler at the marked terminal; an ungrounded boiler is a serious shock and damage risk.

  1. Install a fused disconnect or service switch as required by code.
  2. Add up the boiler pump and each output load on the load sheet to get the total.
  3. Size the 120 Vac supply wire to that total and connect it to terminal block T1 (hot, neutral, ground).
  4. Install a surge suppressor in the supply line if possible.
  5. Confirm the ground wire is on the boiler ground terminal before power-up.

Pressure/temperature gauge range and tapping

Weil-McLain · SlimFit 1000-2000 Series 2 boilers

The shipped P/T gauge reads up to 75 PSIG and meets ASME requirements only for relief valves set to 50 PSIG or less. Higher relief valve settings need a gauge with a higher range. If the gauge needs a larger tapping than the ¼-inch NPT tapping, add a tapping in the nearby piping before any isolation valve.

  1. Mount the P/T gauge in the ¼-inch NPT tapping on top of the boiler supply outlet pipe.
  2. For relief valves above 50 PSIG, use a gauge with a higher pressure range.
  3. If a larger tapping is needed, add it in the near-boiler piping before any isolation valve.

Priority timing (MAX ON and MIN ON)

Weil-McLain · ECO Tec Series 3 multi-system heating

Priorities decide which system runs first. MAX ON TIME is how long a priority can run before a lower priority's call is served. MIN ON TIME is how long a priority must run before a higher priority or the next lower priority can take over. DHW on priority 1 is a typical example.

  1. Set MAX ON TIME for each priority so no system is held off too long.
  2. Set MIN ON TIME so the boiler does not switch priorities too quickly.
  3. Each priority keeps its own parameters, and the system type sets the defaults. Choose CUSTOM to create a new system type.

Propane orifice and blower plate setup

Weil-McLain · SlimFit SF-550 and SF-750

Propane operation needs specific hardware. Check the fuel type before setting up the boiler.

  1. Confirm the boiler is set for natural gas or propane before startup.
  2. For propane, install the propane gas orifice; boilers ship without one.
  3. On SF-550, the blower plate is used for both natural gas and propane.
  4. On SF-750, use the blower plate for propane only; do not use it on natural gas.
  5. Set HIGH ALTITUDE = YES in the control above 5,500 ft.

Protect the air inlet with a bird screen

Weil-McLain · Ultra air intake

The air inlet opening needs a screen to keep foreign objects out.

  1. Get a bird screen sized for the air inlet opening from WM Technologies.
  2. Insert the screen into the air inlet opening.

Provide access to the boiler air inlet for filter cleaning

Weil-McLain · SlimFit 1000-2000 Series 2 direct vent air inlet

The boiler air inlet must stay accessible for periodic inspection and cleaning of the air inlet filter. Use an 8-inch capped tee or arrange the air piping so it can be disconnected from the boiler air connection.

  1. Install an 8-inch vent/air manufacturer tee on the air line, with the cover on the same side as the heat exchanger cleanout cover.
  2. If using 6-inch air piping, install a pipe size reducer on top of the tee. Do not use a 6-inch tee.
  3. Use only air piping materials listed in Figure 22.
  4. Alternatively, arrange the air piping so it disconnects from the boiler air connection.

Record boiler size and CP number before calling

Weil-McLain · SlimFit 550 and 750 Series 3

The CP number is on the left side of the control box.

  1. Fill in the SlimFit Gas Data Collection Sheet (page 124).
  2. Record the boiler size and the Consumer Protection (CP) number from the left side of the control box before calling for support.

Record commissioning data on the install sheets

Weil-McLain · SlimFit Series 3 commissioning

The manual provides blank install and data sheets for the boiler settings, network, priority, combustion and gas data. Keep them with the installation certificate.

  1. Record the flame signal on the control display at high fire and at low fire.
  2. Note whether the venturi was changed and whether the gas valve throttle or offset was adjusted.
  3. Measure CO2 and CO at high fire and low fire and record them.
  4. Measure gas input rate at high and low fire in CFH for the fuel in use (natural gas or propane).
  5. Record the control settings for Boiler, Network and each Priority group as configured.
  6. Fill in and sign the Installation and Service Certificate, then leave the records with the owner or maintenance person.

Record CP number, serial and model

Weil-McLain · SVF 500 and 600 boilers

The CP number is on the boiler jacket and the model number is on the rating label. Record the CP number and serial on the Installation and Service Certificate (page 146). Include the model, CP and serial numbers in any call or letter about the boiler.

  1. Find the CP number on the boiler jacket.
  2. Find the model number on the boiler rating label.
  3. Write the CP number and serial number on the Installation and Service Certificate on page 146.
  4. Give the model, CP and serial numbers when contacting the manufacturer.

Relief valve and pressure/temperature gauge limits

Weil-McLain · All SVF 1500-3000 models

The maximum allowed relief valve setting is 160 PSIG and the boiler ships with a 30 PSIG relief valve. The gauge shipped with the boiler reads to 75 psig and meets ASME requirements only up to a 50 psig relief valve. A higher-rated relief valve needs a gauge with a higher range, and a gauge needing a larger tapping than the 1/4 inch NPT supply tap needs an extra tap placed before any isolation valve.

  1. Never install a relief valve rated above 160 PSIG.
  2. For a relief valve above 50 psig, fit a P/T gauge with a higher pressure range.
  3. If a larger gauge tapping is needed, add the tap in the near-boiler piping before any isolation valve.

Relief valve installation

Weil-McLain · EG/PEG steam boilers

Install the relief valve only in the tapping on top of the boiler, in the vertical position. The valve may discharge large amounts of steam or hot water, so the discharge line is mandatory.

  1. Clean the valve inlet and all connections; remove foreign matter.
  2. Mount the relief valve vertically, connected directly to the top tapping designated in the manual.
  3. Use pipe compound sparingly, or tape, on external threads only.
  4. Use a proper wrench on the wrench pads only; do not use a pipe wrench on the valve body.
  5. Pipe the discharge from the outlet to a safe point with no valve in between.
  6. Make sure the discharge line drains fully and is independently supported and anchored.
  7. End the discharge freely to atmosphere where it is visible and cannot freeze.
  8. Use schedule 40 metal pipe, at least the valve outlet size over its full length. Do not use schedule 80 or extra strong pipe.
  9. Do not cap, plug or obstruct the discharge pipe outlet.
  10. If the discharge is piped upward, provide a condensate drain in the elbow below the vertical run.

Relief valve installation and discharge line

Weil-McLain · EG water boilers

Relief valve is installed vertically in the 3/4 in. tapping on the side of the boiler. A discharge line is mandatory and must follow these rules.

  1. Install the relief valve vertically in the 3/4 in. side tapping.
  2. Follow the manufacturer's tag on the valve.
  3. Keep the discharge line as short as possible and the same size as the valve outlet over its full length.
  4. Pitch the discharge line downward from the valve. End it at least 6 in. above a floor drain where discharge is visible.
  5. End the line plain (not threaded), rated for at least 375°F.
  6. Do not route the discharge where freezing can occur.
  7. Do not put a shutoff valve between the relief valve and boiler or in the discharge line. Do not plug or obstruct the line.
  8. After filling and pressurizing, test the valve by lifting the lever. Confirm it discharges freely. Replace the valve if it does not operate correctly.

Relief valve maximum setting

Weil-McLain · All Ultra Series 4 models

Do not install a relief valve rated above 30 psig. That is the highest allowable relief valve setting for the Ultra boiler.

  1. Check the relief valve pressure rating before installing it on the boiler supply tee.

Relief valve pressure limits

Weil-McLain · SlimFit 1000-2000 Series 2 boilers

Never install a relief valve rated above 100 PSIG, which is the maximum for this boiler. The boiler ships with a 30 PSIG relief valve. Alternate pressure settings are listed in the replacement parts section.

  1. Confirm the relief valve setting is 100 PSIG or less before installing.
  2. Install the shipped 30 PSIG valve or a listed alternate in the 1¼-inch tapping on top of the boiler supply outlet pipe.

Relief valve rating limit

Weil-McLain · ECO Tec 80/110/150/199 Series 3

Never install a relief valve rated above 50 psig, which is the maximum allowed for this boiler. Install the relief valve only after the hydrostatic test.

  1. Use a relief valve rated 50 psig or lower.
  2. Fit the relief valve in the 3/4 in elbow on the air elimination/relief valve water pipe connection, with discharge piping per the venting section.

Required codes for installation

Weil-McLain · All installations

Installation must follow local, state, provincial and national codes. In the US this includes the National Fuel Gas Code (ANSI Z223.1/NFPA 54), the National Electrical Code (ANSI/NFPA 70), and ANSI/ASME CSD-1 where the authority having jurisdiction requires it. In Canada use CAN/CSA B149.1 or B149.2.

  1. Confirm which codes the local authority requires.
  2. Follow NFPA 54 and NEC in the US, or CAN/CSA B149.1/B149.2 in Canada.
  3. Apply ANSI/ASME CSD-1 if the authority having jurisdiction requires it.

Return water temperature and low-temperature systems

Weil-McLain · Low-temperature and radiant systems

Figures 16 and 17 apply only when return water is at least 130°F. Systems with low return temperature need bypass piping to prevent condensation and corrosion.

  1. Use the Figure 16 or 17 piping only for systems designed for at least 130°F return water.
  2. For converted gravity systems, radiant systems or other low-return systems, install bypass piping (page 22).
  3. If the system has radiant circuits, add piping and controls to regulate the supply temperature to them.

Review with owner at startup

Weil-McLain · SVF 1500-3000 Series 1 boiler

Points to cover with the owner at the end of startup.

  1. Review the SVF User's Information Manual with the owner.
  2. Stress the maintenance schedule in the User's Information Manual.
  3. Tell the owner to call a licensed contractor if the boiler or system behaves unusually.
  4. Tell the owner to follow the proper shutdown procedure.
  5. Schedule an annual startup at the start of the next heating season.

Seismic mounting

Weil-McLain · SVF 500/600 boilers in seismic areas

Where bolting down is required, the four brackets used for shipping are reused as seismic brackets.

  1. Level the boiler with the leveling legs until the base is 1/16 in (1.6 mm) above the floor.
  2. Reattach the four brackets with the eight screws and eight lag bolts.
  3. Follow the seismic calculations document and all applicable codes for the final mounting.

Sensor placement for system supply and return

Weil-McLain · Multi-boiler piping with system sensors

Supply and return sensors are strapped to the system piping away from the boiler tees.

  1. Strap the system supply and return sensors to the lines at least 6 pipe diameters from the boiler connection tees.
  2. Do not put the sensors more than 3 feet from the tees.
  3. For redundancy, install a supply and return sensor for each boiler.

Sentinel X100 inhibitor is required

Weil-McLain · ECO Tec Series 3 80/110/150/199

The ECO Tec boiler must have Sentinel X100 in the system to protect the heat exchanger.

  1. After filling as directed, add X100 aerosol following the container instructions.
  2. Let the water circulate and mix.
  3. Check the inhibitor level and add more if needed.
  4. Check the inhibitor level annually with the Sentinel test kit.

Set boiler model, altitude and fuel type first

Weil-McLain · All ECO Tec Series 3 boilers

Boiler model, altitude and fuel type are critical control settings. Wrong values can cause severe injury, death or property damage. Confirm them before adjusting any priority settings.

  1. Verify the boiler model, installation altitude and fuel type on the control.
  2. Correct any mismatch before changing priority or pump settings.

Set maintenance reminder and contractor info

Weil-McLain · Maintenance Info menu

The display shows a maintenance reminder, default 12 months. Set it up with the contractor details and reset it at each service visit.

  1. Open MAINTENANCE and enter contractor name, CP number and install date.
  2. Set the maintenance interval based on service history.
  3. At each service visit, choose RESET REMINDER to update Last and Next dates.
  4. Enter the current date and time so lockout records are time-stamped.
Safety: Gas, electrical and refrigerant work must be done by a licensed technician. Turn off power and gas before servicing, never bypass a safety control, and always follow the manufacturer's manual for your exact model.

General guidance for qualified technicians. The manufacturer's installation and service manual and local codes always take priority. Aurora Star Tech is not affiliated with, endorsed by or sponsored by any equipment manufacturer; brand and model names are used only to identify equipment and belong to their owners.

Emergency Boiler Repair

647-657-2977