Warming things up…Dialing in your comfort…Almost cozy…
Reliable Heating and Cooling Solutions – Quality Service, Fair Prices, Guaranteed Satisfaction!

NTI General: Wall mounting the boiler

Updated · by Aurora Star Tech Inc.

Wall mounting the boiler on a NTI general: Mount the boiler with two people. Use the wall mount kit and the rules for the wall type.

Homeowner with a heating or cooling system problem? Call (647) 657-2977 or book a service call — licensed technicians across Vaughan and the GTA.

Applies to: TRX150, TRX199, TRX199C

How to fix wall mounting the boiler: step by step

  1. Confirm the wall is concrete, brick, block, or wood studs at 16 in. on center, and can hold at least 150 lbs.
  2. Do not mount to a hollow wall.
  3. Position the upper bracket level on the wall; mark four holes, two per side of the bracket.
  4. For wood studs, make sure the holes land on studs and use field washers with the Fischer screws.
  5. Drill, plug and secure the upper bracket.
  6. Attach the lower bracket to the boiler, hang the boiler on the upper bracket, and make sure it is level.
  7. Mark the lower bracket holes, drill and plug the wall, and secure the lower bracket with field screws.
  8. Make sure the boiler is plumb, then tighten the bracket to the boiler.
Safety: Gas, electrical and refrigerant work must be done by a licensed technician. Turn off power and gas before servicing, never bypass a safety control, and always follow the manufacturer's manual for your exact model.

Source: NTI TRX150 manual, p. 14. Written in our own words as a summary; always check the original manual.

General guidance for qualified technicians. The manufacturer's installation and service manual and local codes always take priority. Aurora Star Tech is not affiliated with, endorsed by or sponsored by any equipment manufacturer; brand and model names are used only to identify equipment and belong to their owners.

Emergency Boiler Repair

647-657-2977