Warming things up…Dialing in your comfort…Almost cozy…
Reliable Heating and Cooling Solutions – Quality Service, Fair Prices, Guaranteed Satisfaction!

Noritz Tankless Water Heater: Field gas conversion NG to LP – Noritz NRCR/EZ Pro

Updated · by Aurora Star Tech Inc.

Field gas conversion NG to LP - Noritz NRCR/EZ Pro on a Noritz tankless water heater: Pro units ship for natural gas with the LP kit taped to the top; conversion takes about 5 minutes. Must be done by a qualified installer.

Homeowner with a tankless water heater problem? Call (647) 657-2977 or book a service call — licensed technicians across Vaughan and the GTA.

Applies to: Noritz NRCR Pro and EZ Pro (EZ111/EZ98/EZ71, NRCR111/NRCR92)

Common causes of field gas conversion ng to lp - noritz nrcr/ez pro

  • Job site has LP

How to fix field gas conversion ng to lp - noritz nrcr/ez pro: step by step

  1. WARNING: Turn off gas and power. A digital gas manometer and gas analyzer are required.
  2. Remove the screw and the c-clip, then carefully remove the gas fitting.
  3. Remove the 2 screws securing the venturi fitting.
  4. Remove the NG orifice and insert the LP orifice, keeping the o-ring and gasket in place.
  5. Secure the venturi fitting, refit the gas fitting, c-clip and screw.
  6. Plug in the LP conversion connector.
  7. In EZ Start Plus: Contractor > select unit > passcode > Unit Setting > Convert Gas Type > LP > Done (or use the built-in display).
  8. Check inlet pressure (LP 8-14 in. WC) and offset pressure, check combustion, leak test, and attach the gas conversion sticker.
Safety: Gas, electrical and refrigerant work must be done by a licensed technician. Turn off power and gas before servicing, never bypass a safety control, and always follow the manufacturer's manual for your exact model.

If the unit shows an error code, look it up: Noritz Tankless Water Heater codes

Models

Noritz EZ

EZ71DVEZ98DVEZ111DV

Noritz NRC/NRCP

N-0841MCN-0841MC-DVN-0842MCN-0842MC-DVNRC111-DVNRC111-SV

Noritz CDV

NCC199CDV

Noritz NRCR

NRCR92DVNRCR111DV

Source: Noritz NRCR Pro training (NRCR92/NRCR111, Printable V3), Field gas conversion, p.3-6; Noritz EZ/NRCR Owner's Guide (Rev. 10-25), Gas conversion, p.33. Written in our own words as a summary; always check the original manual.

General guidance for qualified technicians. The manufacturer's installation and service manual and local codes always take priority. Aurora Star Tech is not affiliated with, endorsed by or sponsored by any equipment manufacturer; brand and model names are used only to identify equipment and belong to their owners.

Emergency HVAC Service

647-657-2977