Navien General: Replacing the check valve
Replacing the check valve on a Navien general: Remove the back cover and replace the check valve in the outlet water pipe assembly. Protect the O-rings on the adapters.
Applies to: WEC600
How to fix replacing the check valve: step by step
- Turn off the feedwater supply.
- Disconnect power to the WEC.
- Remove the back cover (see page 82).
- Remove the 4 L-clips from the check valve and Y-adapter, then lift the check valve up and off.
- Insert the O-rings into both adapters and fit the new check valve onto the manifold and Y-adapter.
- Fit the 4 L-clips onto the check valve and Y-adapter.
- Reinstall the back cover and secure it with 11 screws.
If the unit shows an error code, look it up: Navien General codes
Source: Navien WEC service manual, pp. 91-92. Written in our own words as a summary; always check the original manual.
General guidance for qualified technicians. The manufacturer's installation and service manual and local codes always take priority. Aurora Star Tech is not affiliated with, endorsed by or sponsored by any equipment manufacturer; brand and model names are used only to identify equipment and belong to their owners.