Navien General: Replace the product water solenoid valve
Replace the product water solenoid valve on a Navien general: Accessed from the back of the unit after the back cover is removed. Keep track of the O-rings on the adapters so they are not lost or damaged.
Applies to: WEC600
How to fix replace the product water solenoid valve: step by step
- Turn off the feedwater supply.
- Disconnect the power supply from the WEC.
- Remove the back cover from the WEC.
- Remove the 2 L-clips from the Y-adapter and manifold, then lift the check valve out upward.
- From the product/regeneration water pipe assembly, remove the 2 L-clips and connectors.
- Pull the product water solenoid valve assembly out of the unit.
- Insert the O-rings into both adapters.
- Attach the check valve to the manifold and Y-adapter, then install the 2 L-clips.
- Place the back cover on the WEC and secure with 11 screws.
If the unit shows an error code, look it up: Navien General codes
Source: Navien WEC service manual, p. 100-101. Written in our own words as a summary; always check the original manual.
General guidance for qualified technicians. The manufacturer's installation and service manual and local codes always take priority. Aurora Star Tech is not affiliated with, endorsed by or sponsored by any equipment manufacturer; brand and model names are used only to identify equipment and belong to their owners.