Warming things up…Dialing in your comfort…Almost cozy…
Reliable Heating and Cooling Solutions – Quality Service, Fair Prices, Guaranteed Satisfaction!

Navien General: Reinstalling the CIP tank and top frame

Updated · by Aurora Star Tech Inc.

Reinstalling the CIP tank and top frame on a Navien general: Reconnect the CIP tank, place the top frame and reconnect the harness.

Homeowner with a heating or cooling system problem? Call (647) 657-2977 or book a service call — licensed technicians across Vaughan and the GTA.

Applies to: WEC600

How to fix reinstalling the cip tank and top frame: step by step

  1. From the back of the CIP tank, connect the water level sensor connector and CIP dosing pump connector to the harness.
  2. Connect the CIP outlet hose to the CIP dosing pump.
  3. Secure 2 clips on the CIP dosing pump, seat the CIP tank into the WEC and secure it with 4 screws.
  4. Place the top frame assembly on the water treatment system.
  5. Connect the circulation pump connector to the harness.
  6. Connect the product/regeneration pipe connector, outlet water pipe connector and NDI module connector to the harness.
  7. Secure 4 screws on the sides of the top frame (2 per side) and 2 screws on the front side of the top frame.
Safety: Gas, electrical and refrigerant work must be done by a licensed technician. Turn off power and gas before servicing, never bypass a safety control, and always follow the manufacturer's manual for your exact model.

If the unit shows an error code, look it up: Navien General codes

Source: Navien WEC service manual, p. 115. Written in our own words as a summary; always check the original manual.

General guidance for qualified technicians. The manufacturer's installation and service manual and local codes always take priority. Aurora Star Tech is not affiliated with, endorsed by or sponsored by any equipment manufacturer; brand and model names are used only to identify equipment and belong to their owners.

Emergency HVAC Service

647-657-2977