Navien Furnace: Installation checklist: venting
Installation checklist: venting on a Navien furnace: Vent checks for the furnace exhaust and intake piping.
Applies to: NPF700 series (all listed models)
How to fix installation checklist: venting: step by step
- Confirm the vent is 2 in or 3 in schedule 40 PVC, CPVC, polypropylene, or Type BH special gas vent (ULC-S636) for Category IV in Canada, following local codes and the manual.
- Confirm ABS or PVC cellular core pipe is not used for venting.
- Slope the vent upward toward the termination at 1/4 in per foot (2% grade).
- Support all vent runs and the vent termination.
- Seal the air intake and exhaust connections on the flue and vent lines.
- Install termination screen caps on the exhaust and intake pipes.
- Check the venting for leaks.
- Confirm the vent termination is at least 12 in (300 mm) above exterior grade.
- Confirm make-up air is sufficient.
- Confirm total vent length is within the maximum allowed.
If the unit shows an error code, look it up: Navien Furnace codes
Source: Navien NPF installation and operation manual, p. 93. Written in our own words as a summary; always check the original manual.
General guidance for qualified technicians. The manufacturer's installation and service manual and local codes always take priority. Aurora Star Tech is not affiliated with, endorsed by or sponsored by any equipment manufacturer; brand and model names are used only to identify equipment and belong to their owners.