Navien Furnace: Finishing drain and pressure switch tubing
Finishing drain and pressure switch tubing on a Navien furnace: Before the furnace runs, the drain hose must fall toward the trap, the trap must hold water, and the tubing must be cut to length. Do not put the drain hose end underwater.
Applies to: All NDF vent and drain layouts
How to fix finishing drain and pressure switch tubing: step by step
- Slope the drain hose down toward the condensate trap.
- Prime the condensate trap with water.
- Cut the drain hoses to the proper length.
- Cut the pressure switch tubing to the proper length.
- Keep the drain hose outlet out of standing water.
If the unit shows an error code, look it up: Navien Furnace codes
More commissioning tips for furnace
Source: Navien NDF Installation and Operation Manual, p. 41. Written in our own words as a summary; always check the original manual.
General guidance for qualified technicians. The manufacturer's installation and service manual and local codes always take priority. Aurora Star Tech is not affiliated with, endorsed by or sponsored by any equipment manufacturer; brand and model names are used only to identify equipment and belong to their owners.