Navien Furnace: Canadian venting inspection and component rules
Canadian venting inspection and component rules on a Navien furnace: ULC S636 venting must stay on one system and be inspectable.
Applies to: NDF600 series furnaces installed in Canada
How to fix canadian venting inspection and component rules: step by step
- Keep the first 3 ft (900 mm) of venting readily visible for inspection.
- Use primers and glues from the same vent system manufacturer; do not mix brands.
- Do not interchange certified vent components with other systems or unlisted pipe and fittings.
- PVC vent terminations may use listed concentric kits (see section 10.3) or 45 and 90 degree elbows or a tee.
- PPE venting must end in 45 and 90 degree elbows.
If the unit shows an error code, look it up: Navien Furnace codes
More commissioning tips for furnace
Source: Navien NDF Forced Air Gas Furnace Installation and Operation Manual, p. 19. Written in our own words as a summary; always check the original manual.
General guidance for qualified technicians. The manufacturer's installation and service manual and local codes always take priority. Aurora Star Tech is not affiliated with, endorsed by or sponsored by any equipment manufacturer; brand and model names are used only to identify equipment and belong to their owners.