Glow Brand Boiler: Vent slope, support and roof termination
Vent slope, support and roof termination on a Glow Brand boiler: Install exhaust and intake piping so condensate drains back toward the boiler and the piping is secured.
Applies to: Direct vent piping and roof terminations
How to fix vent slope, support and roof termination: step by step
- Slope the exhaust piping upward toward the terminal at a minimum of 1/4 in per foot so condensate drains back to the boiler. Use 1/2 in per foot where condensation is heavy.
- Slope the intake piping downward toward the boiler to prevent water collecting in it.
- Secure all exhaust and intake piping to the wall or structure for rigidity.
- Support the pipe horizontally and vertically at the maximum spacing given in the manual (see notes for conflicting values).
- Install a roof flashing where the pipe passes through the roof to prevent leaks.
- On roofs, point the discharge away from the roof pitch and keep the intake and exhaust at least 24 in apart.
- Install a 1/2 in x 1/2 in galvanized screen in the vent end if desired (optional).
- Insulate exhaust piping that runs through unconditioned space to limit condensate.
- For vertical exhaust, fit an additional condensate drain. All fittings must be ULC S636 approved.
- Keep the terminal at least 12 in above grade or expected snow level, and at least 12 in above highest expected snow level for roof terminations (18 in in Canada).
If the unit shows an error code, look it up: Glow Brand Boiler codes
Source: Glow Brand C95 & C140 installation & operating manual, p. 24, 27, 28, 31. Written in our own words as a summary; always check the original manual.
General guidance for qualified technicians. The manufacturer's installation and service manual and local codes always take priority. Aurora Star Tech is not affiliated with, endorsed by or sponsored by any equipment manufacturer; brand and model names are used only to identify equipment and belong to their owners.