Run system charge verification on a Daikin heat pump: The app shows the recommended charge to add to meet the required charge. The calculated subcool is shown once the system stabilizes at full speed. Gauge readings can take up to 5 minutes to reach the app.
Applies to: Inverter systems using Daikin One Touch
How to fix run system charge verification: step by step
- Add the recommended charge shown in the app.
- Wait for the system to stabilize and run at full speed.
- Read the calculated subcool shown in the app.
- Allow up to 5 minutes delay between gauge reading and app verification.
- Stop the verification to generate a report.
If the unit shows an error code, look it up: Daikin Heat Pump codes
Source: Daikin One Touch Smart Thermostat Training Module TRC-10, p. 31. Written in our own words as a summary; always check the original manual.
General guidance for qualified technicians. The manufacturer's installation and service manual and local codes always take priority. Aurora Star Tech is not affiliated with, endorsed by or sponsored by any equipment manufacturer; brand and model names are used only to identify equipment and belong to their owners.