Daikin Air Conditioner: Prepare the unit for a long period of non-use
Prepare the unit for a long period of non-use on a Daikin air conditioner: Dries the inside of the unit and protects it while idle.
Applies to: Room air conditioner, remote controller
How to fix prepare the unit for a long period of non-use: step by step
- Run FAN mode on a mild day for several hours to dry the inside.
- After operation stops, turn off the room air conditioner circuit breaker.
- Clean the air filters and reattach them.
- Remove the batteries from the remote controller to prevent leakage.
- When restarting, make sure the drain hose outlet is not blocked, then turn the breaker back on. The unit runs an automatic operational check.
- Schedule periodic maintenance by a qualified contractor in addition to user cleaning.
If the unit shows an error code, look it up: Daikin Air Conditioner codes
Source: Daikin Atmosphera operation manual, p. 44. Written in our own words as a summary; always check the original manual.
General guidance for qualified technicians. The manufacturer's installation and service manual and local codes always take priority. Aurora Star Tech is not affiliated with, endorsed by or sponsored by any equipment manufacturer; brand and model names are used only to identify equipment and belong to their owners.