Other: Boiler tips (part 49 of 50)
Short, practical technician tips on other for boiler. Check each one against the manual for your exact model before acting.
Tools needed for installation and service
Weil-McLain · EG / PEG Series 7 boilers
Standard hand tools are needed for this boiler: a 1/16" flat blade screwdriver for terminal block wiring, a flat blade screwdriver for the gas valve adjustment, a 5/16" socket for the burner access shield, a Phillips screwdriver for jacket screws, pipe wrenches for the gas train, and an inclined or digital manometer to measure incoming gas pressure.
Touchscreen navigation
Weil-McLain · SVF 500/600 Series 1
The display is operated by swiping, pressing, scrolling and double tapping.
- Swipe left or right to move between screens.
- Press icons on screen to act.
- Place a finger on the empty part of the slide bar and hold to scroll, or swipe up or down on applicable screens.
- Double tap an editable parameter to enter edit mode.
Troubleshooting tools and kits
Weil-McLain · 80/110/150/199 Series 3
Tools recommended for troubleshooting the ECO Tec boiler, with their purposes.
- Phillips screwdriver #2: multiple uses.
- 5 and 4mm Allen wrench: adjust gas valve settings.
- 3mm Allen wrench: remove ignition electrode screws.
- 8mm wrench: remove blower.
- 10mm wrench: remove heat exchanger cover plate.
- T20 long-handled Torx driver: remove burner screws and mixer/venturi.
- Large crescent wrench: remove gas valve.
- Multimeter: measure sensors and electrical components.
- Manometer (inclined or digital): measure INLET gas pressure to the boiler.
- Combustion analyzer (digital preferred): combustion testing and adjustments.
- Contact thermometer: check surface temperatures of heat exchanger and pipes.
- Maintenance kit: always keep on hand in case replacement is needed.
Troubleshooting tools list
Weil-McLain · SlimFit 1000-2000 MBH Series 2
Recommended tools for SlimFit troubleshooting and what each is used for.
- #2 Phillips screwdriver: remove 4 screws for the top front cover.
- 1/16 inch flat blade screwdriver: terminal block wiring.
- 3/16 inch Allen wrench: remove gas valve pressure tap plugs.
- 13 mm nut driver or ratchet: remove heat exchanger cleanout plate, mixing tube or blower.
- 3 mm Allen wrench: adjust gas valve throttle.
- 4 mm Allen wrench: add orifice to change natural gas to propane.
- 13 mm wrench: access combustion system, heat exchanger, blower or mixing tube.
- Multimeter: measure sensors and electrical components.
- Manometer (inclined or digital): measure incoming gas pressure.
- Combustion analyzer (digital preferred): combustion testing.
- Contact thermometer: check surface temperatures of heat exchanger and pipes.
- T40 Torx driver: gas valve offset adjustment.
- 8 mm wrench: gas piping to venturi.
Turn off all power before servicing
Weil-McLain · Ultra 80, 105, 155, 230, 299, 399
The boiler ON/OFF switch does not cut all power. Internal wiring stays live when the switch is off.
- Turn off all power to the boiler at the external switch or breaker before servicing.
- Label all wires before disconnecting control wiring.
- Never jumper a device except for momentary testing.
Turn power off before service and label wires
Weil-McLain · ECO Tec series 3 80/110/150/199
Power must be off before servicing or making connections to prevent electrical surges that can damage components. Label all wires before disconnecting them.
- Turn power off to the boiler before servicing or making connections.
- Label every wire before disconnecting it.
- Verify wiring after reconnecting to avoid unsafe operation.
Two types of lockouts
Weil-McLain · EG and PEG Series 7 boilers
The control has manual reset lockouts, which need the operator to reset them at the display, and automatic reset lockouts, which clear by themselves once the fault condition goes away.
- For a manual reset lockout, go to the reset screen and answer the reset question.
- For an automatic reset lockout, correct the condition and wait for the control to clear it.
U-Control display colors and symbols
Weil-McLain · U-Control on Ultra Series 4
Blue means space heating, purple means DHW, and red means maintenance or an error. A wrench symbol shows that scheduled maintenance is due. An exclamation mark shows that a problem was detected. A flashing display is a lockout.
- Blue: space heating call.
- Purple: DHW call.
- Red toggling between graphic and maintenance screens: maintenance due, shown during standby only.
- Red with exclamation mark: error or limit event.
- Flashing red: lockout; check the three screens (Figure 124, page 117).
U-Control display colours and symbols
Weil-McLain · U-Control on Ultra Series 4
Blue means space heating or a button was pressed. Purple means DHW. Red means an error or limit event. A solid red screen with the exclamation mark is a non-shutdown failure such as an outdoor or system sensor. A flashing red display means lockout and needs attention to restart. A wrench symbol means maintenance is due and shows only in standby.
- Blue backlight: space heating active or a button was pressed.
- Purple backlight: DHW heating.
- Red backlight with exclamation mark: non-shutdown failure, boiler still runs.
- Flashing red display: lockout, check the boiler before restarting.
- Wrench symbol: maintenance date reached, tell the homeowner to call for service.
Ultra-399 propane conversion uses the gas valve throttle screw
Weil-McLain · Ultra-399
The Ultra-399 is converted by adjusting the gas valve throttling screw rather than changing the orifice. A flue gas analyzer is required to set the valve correctly. Improper settings can cause severe injury, death or property damage.
- Use a flue gas analyzer to set the gas valve throttling screw.
- Follow the Ultra-399 throttle adjustment procedure on page 41 of the manual.
Ultra-80 natural gas boilers need a burner kit for propane
Weil-McLain · Ultra-80 natural gas boilers
Converting a natural gas Ultra-80 to propane also needs a burner in addition to the orifice change. The general instructions in this manual do not apply to this conversion.
- Use only the instructions included in the special-order conversion kit for Ultra-80 natural gas to propane.
Use only approved vent dampers
Weil-McLain · EG 30 through EG 75 and PEG Series 7 boilers
Only the dampers listed in the replacement parts tables are approved for EG and PEG Series 7 boilers. Any other damper can cause severe injury or death.
- Check the damper part number against the approved list before installing.
- Replace the damper with an approved size and type for the boiler model and steam or water application.
Use only genuine replacement parts
Weil-McLain · ECO Tec series 3 80/110/150/199
Buy replacement parts through a local WM Technologies distributor. Modified or non-approved parts are not covered by warranty and can damage the boiler or impair operation.
- Order parts with the boiler model, size, part description and part number.
Use only the vent kits listed for the install
Weil-McLain · All direct exhaust and direct vent installs
Vent and air materials and termination kits must come from the list in Table 9 and the vent maker's instructions. Canadian installs need a ULC S636-compliant kit.
- Confirm the vent and air materials against Table 9, p. 33 before ordering or installing.
- For Canadian installations, use a ULC S636-compliant vent kit.
Use propane-compatible pipe dope on orifices
Weil-McLain · CGi-25 to CGi-8
Use only pipe dope compatible with propane gas on orifice threads, even when the boiler will run on natural gas.
- Pick a pipe dope rated for propane before threading orifices in.
Use sweep elbows and bird screens on vent and air piping
Weil-McLain · SlimFit 1000-2000 Series 2
Short-radius elbows add pressure loss and cut the allowable vent and air pipe length. Bird screens must come from the vent or air piping supplier.
- Use sweep elbows for all vent and air piping whenever possible.
- Check the maximum lengths and fitting reductions in Figure 24 (page 29).
- Install a vent manufacturer's bird screen at each termination, bought from the vent/air piping supplier.
Use sweep elbows only in vent and air piping
Weil-McLain · ECO Tec Series 3 vent and air piping
Short-radius elbows affect boiler performance and are not allowed in vent or air piping.
- Use sweep 90° or 45° elbows for every elbow in vent and air piping.
- Count each elbow against the maximum equivalent length.
Use sweep elbows only in vent and air runs
Weil-McLain · All direct vent layouts
Short radius elbows reduce boiler performance. Use sweep elbows for all vent and air piping, including the horizontal, vertical and termination runs.
Vent adapter and air intake fittings
Weil-McLain · Direct vent installations
Fittings for direct vent air and flue connections.
- Flue adapter (item 11) fits 3 inch PVC, 3 inch PP, and 3 inch SS.
- Air intake adapter (item 21) fits 3 inch PVC only.
- Internal flue pipe (item 12) carries exhaust from the heat exchanger to the flue adapter.
Vent and air piping material rules
Weil-McLain · All SVF vent and air piping
Only use materials listed for vent and air piping. Non-metallic vent and fittings must not be covered with thermal insulation. Failure to follow these rules can cause severe injury, death or property damage.
- Use only the materials in Table 9 (page 33). Do not use cellular core PVC (ASTM F891), cellular core CPVC or Radel (polyphenylsulfone).
- Fit a locking collar on every polypropylene vent and air joint. Use only the listed collars.
- Permanently join all PVC and CPVC joints using the correct primer and cement for that material.
- Do not mix piping from different manufacturers unless using adapters made for that purpose by the manufacturer.
- Do not insulate non-metallic vent pipe or fittings.
- Make sure any leaks at unlocked joints are fixed before startup, since unsealed joints can leak vent gas.
Vent and air termination placement and spacing
Weil-McLain · Direct vent terminations, single and multiple boilers
Keep terminations clear of stones, balls, leaves, sediment and snow. Keep the vent and air outlets above grade and snow line. Multiple sidewall air terminations need at least 6 in spacing; vents must be at least 6 in apart on multiple boiler installations. For US roof penetrations, keep at least 12 in between the air intake elbow and an adjacent boiler vent pipe. Canadian installations must follow CSA B149.1 and use a ULC S636 compliant vent kit. Terminate all vents at the same height and all air pipes at the same height.
- Select a termination spot that avoids damage from objects and leaf or sediment buildup.
- Keep the outlets clear of snow accumulation and above grade or snow line.
- Space multiple sidewall air terminations at least 6 in apart and space vents at least 6 in apart.
- For US roof layouts, keep 12 in minimum between the air intake elbow and an adjacent boiler vent pipe.
- Keep all vent outlets at one height and all air outlets at one height.
Vent damper clearances and harness rules
Weil-McLain · Boilers with vent damper
Clearance and harness-disconnect rules for the vent damper. Bypassing the damper lets carbon monoxide into the building.
- Keep at least 6 in. between the vent damper and any combustible material.
- Keep at least 46 in. between the jacket top and a combustible ceiling.
- Never jumper or bypass the vent damper.
- After the boiler has run once, disconnecting either end of the harness causes a safety shutdown. The boiler will not restart until the harness is reconnected.
Vent fittings and reducers
Weil-McLain · All Ultra vent and air piping
Fitting rules for vent and air piping. Use sweep elbows only and reducers in place of bushings.
- Use sweep elbows only in vent and air piping. Do not use short-radius elbows.
- When stepping down from 4 in to 3 in or 3 in to 2 in, use a tapered reducer with a PVC nipple at least 6 in long.
- Do not use a bushing. A bushing will not seal in the boiler flue/exhaust adapter.
- Put a 3x2 reducer at the boiler and at the termination for 2 in runs; put a 4x3 reducer at the boiler and at the termination for 3 in runs.
- Do not mix plastic piping types. Do not use cellular core pipe.
- Stainless AL29-4C vent: install a PVC-to-stainless adapter at the boiler, and at the termination unless using separate-pipe termination.
Vent material limits and bird screens
Weil-McLain · All Ultra vent and air piping
Approved vent materials and the screens that must go on each termination.
- Use only the vent and air materials listed in Figure 13. Use only PVC Schedule 40 with concentric terminations; DWV, CPVC and ABS are not allowed there.
- Use locking collars on every joint of polypropylene vent systems.
- Put a bird screen on every vent and air termination. Screens are sold separately and most kits do not include them.
- For flex polypropylene, convert length with the listed equivalent factors (e.g., Duravent 4 in: 3.0 equivalent ft per ft). Keep the total equivalent length within the Figure 12 limits.
- Stainless AL29-4C vent must be installed with the certified manufacturer adapter.
Vent piping installation practices
Weil-McLain · SVF 1500-3000 Series 1, Category IV venting
Use sweep elbows where possible. Short-radius elbows add pressure loss and reduce allowable vent length.
- Install the vent manufacturer's adapter and reducer (if needed) at the boiler vent connection.
- Slope horizontal vent piping toward the boiler at least 1/4 in per foot.
- Support piping independently of the boiler every 5 ft on horizontal and vertical runs.
- Install a hanger within 6 in of any upturn in the piping.
- Use a locking collar on every joint of polypropylene vent piping.
- Keep total vent length within the maximum in Figure 25 (page 31).
Vent piping slope, support and fittings
Weil-McLain · Direct vent piping, all configurations
Use sweep elbows whenever possible, since short-radius elbows add pressure loss and reduce the allowable vent length. Slope horizontal vent runs at least 1/4 in per foot toward the boiler. Support the piping independently of the boiler every 5 ft on horizontal and vertical runs, and place a hanger within 6 in of any upturn. Every polypropylene joint needs a locking collar. Do not exceed the maximum outside vent and air lengths, since freezing condensate or piping failure can result.
- Use sweep elbows where possible and check allowable length against the vent length figure.
- Slope horizontal vent piping at least 1/4 in per foot toward the boiler.
- Support pipe independently of the boiler every 5 ft on horizontal and vertical runs.
- Place a hanger within 6 in of any upturn.
- Install a locking collar on every polypropylene joint.
- Keep exposed outside lengths within the maximum shown in the outside piping figure.
Venting and combustion air requirements
Weil-McLain · SlimFit SF1000-SF2000 direct vent and direct exhaust
SlimFit boilers require special Category IV venting. Only the vent materials and methods listed in the manual may be used. 10 in venting needs the 10 in vent adapter from the vent manufacturer.
- Use only the vent materials and methods in the manual.
- Use a SlimFit Vent/Air Adapter to match the vent or air pipe to the 10 in connection.
- Use a reducer only where the manual permits a smaller vent pipe than the adapter outlet.
- Confirm vent/air piping equivalent length and apply the derate for the boiler size and venting type.
- Install per local codes and NFGC ANSI Z223.1/NFPA 54 (US) or B149.1 (Canada).
Venting must be Category IV
Weil-McLain · SVF 1500-3000 Series 1
SVF boilers need special venting for a Category IV boiler. Direct vent or direct exhaust is allowed through a side wall or roof. Category II venting is a different method covered on pages 27-28.
- Use only the vent materials and methods listed in the manual.
- Confirm the vent type (direct vent or direct exhaust) and pipe size before installing.
- Follow local codes and the National Fuel Gas Code or CSA B149.1 for the installation.
Venting options and lengths
Weil-McLain · ECO Tec Series 3 boilers, direct vent or direct exhaust
ECO Tec can be direct vent or direct exhaust. Direct vent runs out a sidewall, through the roof, or through dual pressure zones. Direct exhaust runs out a sidewall or through the roof. The vent can run up to 100 ft in PVC, CPVC, PP or stainless steel.
- Choose direct vent or direct exhaust based on the install location.
- Select a sidewall or through-the-roof termination for the chosen mode.
- Keep total vent length within 100 ft using PVC, CPVC, PP or SS pipe.
Vertical direct exhaust termination
Weil-McLain · SVF 1500-3000 Series 1, direct exhaust vertical
Vertical terminations use a coupling or open-end pipe termination and are kept clear of snow and debris.
- Locate the termination away from stones, foreign objects, leaves and sediment buildup.
- Keep the termination at least 12 in above grade and snow line.
- Install a vent manufacturer's bird screen in the open end.
- Keep exposed outside vent length to the maximum in Figure 27 to avoid condensate freezing.
General guidance for qualified technicians. The manufacturer's installation and service manual and local codes always take priority. Aurora Star Tech is not affiliated with, endorsed by or sponsored by any equipment manufacturer; brand and model names are used only to identify equipment and belong to their owners.