Warming things up…Dialing in your comfort…Almost cozy…
Reliable Heating and Cooling Solutions – Quality Service, Fair Prices, Guaranteed Satisfaction!

Weil-McLain Boiler: WMZV zone valve controller plus boiler-controlled DHW

Updated · by Aurora Star Tech Inc.

WMZV zone valve controller plus boiler-controlled DHW on a Weil-McLain boiler: DHW is piped directly to the boiler. The zone controller calls for heat on INPUT 2, and the system circulator on OUTPUT 2 runs whenever the zone controller calls. DHW is on INPUT 1 and PRIORITY 1, with the DHW circulator on OUTPUT 1.

Homeowner with a boiler problem? Call (647) 657-2977 or book a service call — licensed technicians across Vaughan and the GTA.

Applies to: SF1000L/R, SF1500L/R, SF2000L/R

How to fix wmzv zone valve controller plus boiler-controlled dhw: step by step

  1. Wire the zone controller call for heat (X-X) to INPUT 2 and keep INPUT 2 on PRIORITY 2.
  2. Wire the DHW aquastat to INPUT 1 and assign INPUT 1 to PRIORITY 1.
  3. Wire the DHW circulator to OUTPUT 1.
  4. Wire the system circulator to OUTPUT 2.
  5. Set the heating system type in PRIORITY 2 as required.
Safety: Gas, electrical and refrigerant work must be done by a licensed technician. Turn off power and gas before servicing, never bypass a safety control, and always follow the manufacturer's manual for your exact model.

If the unit shows an error code, look it up: Weil-McLain Boiler codes

Source: SlimFit Series 2 Boiler Manual 550-100-561/1225, p. 61. Written in our own words as a summary; always check the original manual.

General guidance for qualified technicians. The manufacturer's installation and service manual and local codes always take priority. Aurora Star Tech is not affiliated with, endorsed by or sponsored by any equipment manufacturer; brand and model names are used only to identify equipment and belong to their owners.

Emergency Boiler Repair

647-657-2977